Coppell South Sub-CS060309COPPELL
March 9, 2006
lbrahim A. Hussein, P.E.
TXU Electric Delivery
PO Box 970
Fort Worth, TX 76101
RE: Coppell South Substation
REVISED Fee Assessment Letter
Dear Mr. Hussein:
Enclosed is a copy of the REVISED City of Coppell Development Fee Assessment table, along with a
copy of the Development Fee calculations for the referenced development. The revision is based on the
size modification of the irrigation meter from a 2-inch meter to a 1 ½" meter.
Roadway Impact Fees have been paid to the City of Coppell in the amount of $286.20 . Water Impact
Fees should be paid at the Building Inspections Department located at 500 Southwestern Blvd. in the Fire
Administration Building.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction
inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-
construction meeting.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Charlene La Matting, E.I.T.
Graduate Engineer
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Daniel Dewey, Halff Associates
Robert Hafkesbring, Designs in Nature
2S5 PARKWAy ~{ p.O.BOX 947B ~ COPPELL TX 750J9 * Tel 972/462 0022 ~ FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Coppell South Substation
Date: $/8/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $50.00
(100% due at Issuance o£Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $140.78
( 100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at lssuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway hnpact Fee $286.20 $286.20
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) II
TOTAL $1,906.98
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $286.20
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell South Substation
DATE: 3/8/2006
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 -1 1/2 inch
0
0
Total #: 5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea,
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total #: 1 irrigation Meter(s) @ $140.78
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
'(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0
(Due prior to issuance of building permit)
$280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
0 ESU's
5 ESU's
0 ESU's
0 ESU's
$1,400.00
$5O.OO
$0.00
$14O. 78
$0.00
$0.00
$0.00
$3O.OO
$0.00
$0.00
$0.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$286.2O
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Coppell South Substation
3/8/2006
ROADWAY IMPACT FEE:
Service Area * 10
Category ** Industrial
Land Use ** General Light Industrial
Building Area (sf) 900
Development Units ** 0.90
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due - (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $286.20
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)