Northlake 635(13)-CS060310COl'FELL
March 9, 2006
l!rik I lauglie. P.E.
Pacheco Koch Consulting Engineers
8350 N. Central Exp'aT., Suite 1000
Dallas. TX 75206
RE: Northlake 635 Business Parle' Lot 2R. Block C (tbrmerly Coppell Business Center III)
Fee Assessment Letter
Dear Mr. Itauglie:
Enclosed is a copy' of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Roadway impact Fees to the City of Coppell in the amount of $15,599.51
and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount
is a portion of the assessed lees that need to be paid prior to filing of the final plat. Please provide a copy
of the Engineer's estimate or contract with lbe Construction Development Permit application to our office
so thc 2% & 4% construction inspection fee can be verified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
Water and Wastewater hnpact ['ecs are to be paid upon issuance of the Building Permit. These are paid by
separate check at thc Building Inspections Department located at 500 Southwestern Boulevard in the Fire
Administration Building.
The additional ices tbr water and sewer taps, water meters, and utility inspection fees need to be paid, too,
by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees arc paid. }'lease note that although Double Detector Check Valve Assemblies are no
longer available for purchase through the Citv, they are still required, and Water Impact Fees have been
assessed based on the DDC specified in the plans. The developer or his designee will be required to
provide a DDC from thc list ofapproxed assemblies available from Public Works.
,Appropriate pa>'mcnt of the required fees will help insure a successful beginning of this project. We look
lbmard to v, orking with you on lhis project. If you have an> questions, please contact mc.
Sincerely,
N · o .
('harlene La, lattma, E.I.T.
Graduate Engineer
CC:
Jennifer Armstrong. Finance Director Greg Jones, Chief Building Official
Mary Beth Spletzer. Admin Tech. Bldg lnsp Brad Reid, Dir.of Parks & Recreation
Glenn Hollowell. Assr Director of Public Works
Project:
Date:
EVELOPMENT FEE TAE E
Northlake 635 Business Park Orormerly Coppell Busine.s.~ Center liD, Lot 2R, Block C
$/9/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water hnpact Fee Sl 1,844.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fec $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $204.34
(100% due at Issuance of Water Meter)
Water Meter Fee (lrrigation/Fireline) $204.34
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,797.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway hnpact Fee S 15,599.51 $15,599.51
(100% due prior to Filing Plat)
Street Light Fee Informalion not Available
(100% due prior to Acceptance of Project) ii
Street Sign Fee Inlbrmalion not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee lnformatiun not Available
(I 00% due prior to Start of Construction)
[OTAL $32,959.19
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $15,599.51
r'-'VELOPMENT FEE WORKSH .,'T
PROJECT: Northlake 635 BuMness Park (formerly Coppell Business Center 1II), Lot 2R, Block C
DATE: 3/9/2006
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch 533 ESU's
1 - 2 inch 533 ESU's
0 0 ESU's
1 - 8 inch = 2.5 ESU's
Total#: 13,16 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
$11,844.00
$150.00
$204,34
$204.34
$000
$0.00
$30.00
$3O00
$4,797.00
$50,00
$50.00
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $204.34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $204.34
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESL's: 5.33
(Due prior to issuance of building permit)
@$900 O0 ea.
Wastewater 'Yap Inspection Fee:
Total fi: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $5000 ea.
(100% due prior to issuance of building permit)
Page1
F-'VELOPMENT FEE WORKSH ;T
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Single-family @ $000 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$15,599.51
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Cnnstruction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Depadment.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
RO/'~ WAY IMPACT FEE CALCUL .IONS
PROJECT:
DATE:
Northlake 635 Business Park (formerly Coppell Business Center 111), Lot 2R, Block C
3/9/2006
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Office
Land Use ** General Office Building
Building Area (sf) 14,545
Development Units ** 14.55
Vehicle Miles per Development Unit ** 7.15
Fee per Vehicle Mile *** $150
Roadway Impact Fee due (Development Units) x
Vehicle Miles per Development Uoit) x (Fee per Vehicle Mile) $15,599.51
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
I AMOUNTDUE: $i5,5~9.51 /