Loading...
Denton Tap 3A-LR060308S^M E.G .EE.I.G & TES ',.G. ,~ Serving The Geo-lndustry Since 1974 __ 1115 Luke Street, Suite 100 Irving, Texas 75061 Phone: (972) 790-1910 · FAX: (972) 790~0967 CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT CLIENT: Head Construction, Inc STANDARD 6" X 12" 3030 LB J, Ste: 700 AREA 28.27 SQ. IN. Dallas, TX 75234 REPORT DATE: 3/8/06 PROJECT: Proposed Coppell Montessori Academy.~~ 136 Fitness Ct. /r,/ ! ! SAMPLE DATE:3/7/06 Coppell, TX ~ / PROJECT NO.: 817TXIK8 ATTN: Ken Head REPORT NO.: 5 SE&T TECHNICIAN: Bp/an Butler LOCATION OF PLACEMENT: Southeast Entrance PAGE 1 OF 1 Time Arrived: 2:35 PM Concrete Supplier: TXI Time Left: 5:02 PM Ticket #: 216426 Slump (Inches): 4 Truck #: 737 Concrete Temperature (F): 83 Time matched: 3:19 PM % Air Content: 5 Time Sampled: 4:15 PM Total No. of Test Cylinders Made: 4 Product Code: 8274 Total Cubic Yards Placed: 20 Cement: N/A Added Water: N/A Fly Ash: N/A Weather Conditions: Partly Cloudy & Warm Coarse A~lre~late: N/A Air Temperature (F): 75 Water: N/A Unit Wei~lht of Fresh Concrete: 145 % Air Content: N/A 2A 7 3/14/06 3600/28 2B 14 3/21/06 3600/28 2C 28 4~4~06 3600/28 2D 28 4/4/06 3600/28 Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By: Slump ASTM C-143 ASTM C-39 & 231 SE&T Remarks: /i,l Sadik (SAM) AI-Musawe, M,Sc, PhD, P.E. I i Civil & Environmental Engineer Texas Registration Number: 61893 This repod is for the sole use of the client addressed, The use of our company name must receive our prior written consent Th is repod only applies to the samples tested and does not necessarily represent identical or similar samples. G:120051817txik5/CpistrlCpistr51LL