Denton Tap 3A-LR060308S^M E.G .EE.I.G & TES ',.G.
,~ Serving The Geo-lndustry Since 1974 __
1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790~0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT: Head Construction, Inc STANDARD 6" X 12"
3030 LB J, Ste: 700 AREA 28.27 SQ. IN.
Dallas, TX 75234
REPORT DATE: 3/8/06
PROJECT: Proposed Coppell Montessori Academy.~~
136 Fitness Ct. /r,/ ! ! SAMPLE DATE:3/7/06
Coppell, TX ~ / PROJECT NO.: 817TXIK8
ATTN: Ken Head
REPORT NO.: 5
SE&T TECHNICIAN: Bp/an Butler
LOCATION OF PLACEMENT: Southeast Entrance PAGE 1 OF 1
Time Arrived: 2:35 PM Concrete Supplier: TXI
Time Left: 5:02 PM Ticket #: 216426
Slump (Inches): 4 Truck #: 737
Concrete Temperature (F): 83 Time matched: 3:19 PM
% Air Content: 5 Time Sampled: 4:15 PM
Total No. of Test Cylinders Made: 4 Product Code: 8274
Total Cubic Yards Placed: 20 Cement: N/A
Added Water: N/A Fly Ash: N/A
Weather Conditions: Partly Cloudy & Warm Coarse A~lre~late: N/A
Air Temperature (F): 75 Water: N/A
Unit Wei~lht of Fresh Concrete: 145 % Air Content: N/A
2A 7 3/14/06 3600/28
2B 14 3/21/06 3600/28
2C 28 4~4~06 3600/28
2D 28 4/4/06 3600/28
Curing ASTM C-31 Test Method Cylinder Made By: Cylinders Tested By:
Slump ASTM C-143 ASTM C-39 & 231 SE&T
Remarks:
/i,l
Sadik (SAM) AI-Musawe, M,Sc, PhD, P.E. I
i Civil & Environmental Engineer
Texas Registration Number: 61893
This repod is for the sole use of the client addressed, The use of our company name must receive our prior written consent
Th is repod only applies to the samples tested and does not necessarily represent identical or similar samples.
G:120051817txik5/CpistrlCpistr51LL