Loading...
SS9901-CS060201TCB AECOM February 1, 2006 Mr. Charles Ferrara President Can-Fer Construction Company 11031 Grissom Lane Dallas, TX 75229 Subject: DeForest Lift Station Pricing Request Dear Mr. Ferrara: Please provide pricing information for the following items at the DeForest Lift Station: 1. Provide and install an additional support under the 30-inch resilient wedge gate valve located at the east end of the valve vault. 2. Provide and install two (2) clevis pipe hangers on the 8-inch surge relief piping in the valve vault. Install one hanger immediately south of the 90 degree elbow off Valve V-1. Install the other hanger immediately south of the tee between Valves V-2 and V-3. Submit information on the proposed hangers along with the pricing. 3. Remove the existing 16-inch buried gate valve located approximately 5 feet south of the 45 degree bend at the connection point with the new 16-inch ductile iron force main. Remove the existing 16-inch prestressed concrete cylinder pipe (PCCP) from this bend to the valve. Provide and install additional 16-inch ductile iron piping from the original connection point (at the 45 degree bend) to the new connection point (at the south end of the removed valve). Connect the 16-inch DI piping to the 16~inch PCCP. We will provide the submitted pricing information to the City for their review and approval. Please feel free to contact me at 972-735-3056 if you have any questions regarding this request. Sincer~l~.~ [rika K. Cooper, P.E. Project Maria§er Mr. Kenneth M. Griffin, P.E. - City of Coppell Mr. Rick O'Dell - City of Coppell File