Loading...
ST9902-CS060309ENGINEE NG DEP TMENT CO R SHEET P.O. Box 9478 255 Parkway Bird Coppell, TX 75019 Phone: (972)304-3679 Fax: (972) 304-3570 To: DISPATCH / CMJ Engineering F~rom.' Larry Davis, Construction Inspector Fax: 817/589-9993 Date: March 1, 2006 Phone: Pages: 1 (including cover sheet) Re: W Sandy Lake Rd (ST 99~02) CC: Suzan Taylor, CIP Coordinator [] Urgent [] For Review [] Please Comment [] Please Reply As Requested AI'rENTION DISPATCH - Densities over storm drain Line C-t need to be scheduled for Thursday, March 2"~ & Friday, March 3"" at 2:00 p.m. both days. The location is on the south side of Sandy Lake Rd starting at North Coppell Rd. This is adjacent to Oakbend subdivision. The same schedule of 2:00 p.m. for densities also needs to be kept for each day next week, Monday thru Friday, March 6m - 10th for this line. Call me if you have any questions. Larry Davi~972-304-3684. Cay of Coppell Eng neermg- Excellence By Destgn