DR9503-CS 960625 MEMORANDUM
To: Gary Sims, Director of Leisure Services
From: Kenneth M. Griff'm, P.E., ACM/City Engineer V~
RE: Andrew Brown Park Outflow Structure (DR 95-03)
Date: June 25, 1996
The contractor selected for the construction of the outflow structure has now completed the
work. One component that was not included in the scope of the work was any overseeing or
hydro mulching in the construction area. Could some type of grass or hydro mulch be installed
by the Leisure Services Department and maintained as part of the overall park?
If you should have any questions please feel free to contact me at your convenience.
file/simmm.696