Loading...
DR9503-CS 960625 MEMORANDUM To: Gary Sims, Director of Leisure Services From: Kenneth M. Griff'm, P.E., ACM/City Engineer V~ RE: Andrew Brown Park Outflow Structure (DR 95-03) Date: June 25, 1996 The contractor selected for the construction of the outflow structure has now completed the work. One component that was not included in the scope of the work was any overseeing or hydro mulching in the construction area. Could some type of grass or hydro mulch be installed by the Leisure Services Department and maintained as part of the overall park? If you should have any questions please feel free to contact me at your convenience. file/simmm.696