Vista Point 2R-CS060316CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-199R3-HC Vista Point Lot Block A P & Z HEARING DATE: C.C. HEARING DATE: March 16, 2006 April 11, 2006 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: Along the west side of MacArthur Boulevard, south of S.H. 121. SIZE OF AREA: 10.046 acres of property CURRENT ZONING: PD- 199-HC (Planned Development- 199-Highway Commercial) REQUEST: Zoning change request from PD-199-HC (Planned Development- 199-Highway Commercial) to PD-199R3-HC (Planned Development-199, Revision 3-Highway Commercial) to attach a Detail Site Plan to allow the development of three buildings, containing. 37,800 square-feet, 41,475 square-feet and 36,250 square-feet, respectively. APPLICANT: Christopher Gardner Jackson Shaw Company 4890 Alpha Road, Suite 100 Dallas TX 75244 (972) 628-7421 FAX: (972) 628-7444 Eric Hauglie Pacheco Koch 8350 N. Central Expressway Dallas, TX 75206 (972) 235-3031 FAX: (972) 235-9544 HISTORY: Page 1 of 6 The subject property was originally part of Lot 3, Block G, a 49.20-acre tract within the Vista Ridge Addition. The property lies within Denton County and was part of the City of Lewisvilte when Item # 6 TRANSPORTATION: the first plat was recorded in September of 1986. Since that time, the City of Coppell annexed this and other portions of the Vista Ridge Business Park. In September 2001, City Council approved a Site Plan and Final Plat to allow for the construction of a one-story, 71,000-square- foot office building on seven acres of this 26-acre parcel of land. The Site Plan would have expired September 11, 2003; however, on September 9, 2003, City Council approved a six-month extension. This Site Plan expired in March 2004. In December 1999, a request for a PD for a gas station, convenience store and car wash on 1.5 acres at this corner of S.H. 121 and MacArthur Boulevard was denied by the Planning and Zoning Commission, and it was not appealed to City Council. On April 13, 2004, Council overruled staff's and Planning and Zoning Commission's recommendation for denial and approved the Concept Planned Development to allow the construction of 210,000- square feet of office/warehouse/assembly buildings and five retail pad sites. Council also approved SUP-1211 for a gas station and car repair on Lot 4 of this PD. In July 2004, Council approved PD-199R-HC, which attached a Detail Site Plan to Tract 1 to allow the construction of the first phase of this development, which included three office/assembly/warehouse buildings with a total of 93,550-square feet. Phase 1 is currently fully constructed and is in the process of being leased. In April 2005, Council approved a Detail Plan to allow the construction of a bank facility on Lot 5 of this development. Bank of Texas should be open in the near future. An Amending Plat was approved in May 2005 which revised the location of various fire lanes, added lot dimensions and updated the owner information. During the same meeting, Council approved a request to re-establish S-1211 permitting the development of a gas station, car wash and car repair facility on Tract 4 of this PD. S.H. 121 is under construction to freeway standards with access roads, within 450 feet of right-of-way. Forest Hill Drive is a residential street built within 50 feet of right-of-way. Page 2 of 6 Item# 6 SURROUNDING LAND USE & ZONING: North - S.H. 121; City of Lewisville South - PD-132-SF-9; The Peninsulas of Coppell, and PD-149-SF- 7, Vistas of Coppell East - Bank of Texas (currently under construction) and vacant property; PD-199-HC (Planned Development-199-Highway Commercial) West- three office/warehouse buildings; PD-199R-HC (Planned Development-199 Revised-Highway Commercial) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for mixed- use development, including retail/commercial, office parks, schools, churches and other compatible non-residential uses. DISCUSSION: As mentioned in the HISTORY section of this report, Council approved a Concept Plan for this property to allow the development of six office/warehouse/assembly uses in April of 2004. This request is to approve the Detail Plan for the second and final phase of this development, consisting of three buildings, totaling 115,525-square feet. While this Detail Plan is in general conformance with the Concept Plan and conditions approved by Council, there are several technical and 'drafting issues and refinements that need to be addressed. SITE PLAN The Site Plan indicates three buildings ranging in size from 35,750 to 40,900-square feet. Per the PD conditions, a maximum of 30% of the aggregate square footage of this entire tract (115,525 x .30) or 34,657- square feet may be devoted to warehouse/distribution in this phase. Additionally, no individual building shall exceed 50% of the floor area being devoted to warehouse/distribution. A note to this effect has been added to the Site Plan; however, the occupancy ratios of the individual buildings have not bccn spccified, given the speculative nature of thi~ development. Another PD condition allows for the inclusion of dock-high doors to serve the warehouse/distribution nature of the future tenants of this development. The condition specifically states the following: "The dock high service doors shall not exceed a ratio of one (1) dock high door for every eight thousand (8,000) square feet of the total aggregate building square footage of each respective Tract." This permits 14 dock-high doors within this phase. The elevations indicate four dock-high doors, plus a potential for three additional dock- Item# 6 Page 3 of 6 high doors serving Building 4. Given the layout of the buildings, only the loading area of this building is deep enough to accommodate large trucks. The other two buildings indicate overhead and entry doors along the rear elevations. Access to this second phase will be via two driveways along S.H. 121 and two along Forest Hill Drive, all being mutual access easements with abutting tracts. As indicated on the Plat, the fire lanes are designated as fire lanes and mutual access easements. Once this "mixed use" PD is fully developed, it will be appropriate to encourage traffic to circulate internally from the place of employment to the retail and restaurants area, without having to access S.H. 121, MacArthur Boulevard or Forest Hill Drive. The driveways along Forest Hill Drive will have "headache bars" over the driveways to prohibit 18-wheeler trucks from accessing Forest Hill Drive; therefore, these two driveways cannot be designated as fire lanes. There are several drafting issues and typos that need to be addressed prior to sending this case forward to City Council: · Remove the shading to clarify that the fire lanes do not extend over the driveways to Forest Hill Drive, where the "headache" bars are proposed. · Add the parking space striping, which is missing at the northeast portion of the Site Plan. · Under Notes and Conditions, delete "in use of most major thoroughfares." · Include the maximum heights of the buildings in the Notes and Conditions. · Correct S.H. 127 to S.H. 121 under the Site Plan title block, and correct the lot designation from Lot 2 to Lot 2R. · Delete the sign note along S.H. 121. It appears to be an existing sign that is not intended to be a part of the official PD Site Plan. · Rectify all inconsistencies in the designation of Lot 2R, not Lot IIR. · All plans need to be consistent with regard to firc hydrant locations. · All fire hydrants need to be within three to five feet of the fire lane. · Correct the spelling of accordance on all Elevation Sheets. LANDSCAPE PLAN The Landscape Plan is also in general conformance with the approved Concept Plan. An original PD condition allowed for a variance to the requirement to provide landscape buffers along internal lot lines, as well as to permit the calculation of the landscape areas on an overall versus a tract- by-tract basis. As part of this submission, staff requested an update to the landscape calculations for the entire PD. Per their calculations, the entire PD is still over by 1,408-square feet of total landscaped areas. Item # 6 Page 4 of 6 Given the amount of retribution required due to the significant tree loss, the applicant has chosen to upsize the trees at the time of planting from 3- to 4- caliper inches. Instead of extending the screening wall adjacent to the first phase into this development, the applicant was permitted, by Council, to plant 52 additional over-story trees on the north side of Forest Hill Drive. There will be approximately 70 trees along this 552-liner feet, where only 11 would normally be required. These trees are proposed to be a variety of evergreen, over-story and omamental, thus providing adequate screening to the project. ELEVATIONS The proposed elevations are utilizing the same materials, color and general design as approved in the Concept Plan, which is a combination of painted tilt-wall, cultured stone veneer, brick and some standing-seam metal roofs. The ratio of tilt-wall to masonry is within the minimums required by the PD Ordinance. The percentage of masonry is proposed as follows: Elevation % required % provided on Detail Plan by PD Building 4 Building 5 Building 6 Front 35-40%0 35% 45%0 41% Side 25-30%0 25-33%0 29-39% 25-28%0 Rear 0% 0 6% General signage area for attached signs have been indicated on the facades of the buildings. To be consistent with Phase 1, all attached signs shall be black. Reflective of City Ordinance, logos of any color will also be permitted up to 20% of the area of the sign. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of PD-199R3-HC, Vista Point II, Lot 2R, Block A, subject to the following technical issues and drafting errors being addressed: 1) Remove the shading to clarify that the fire lanes do not extend over the driveways to Forest Hill Drive, where the "headache" bars are proposed. 2) Add the parking space striping, which is missing at the northeast portion of the Site Plan. 3) Under Notes and Conditions, delete "in use of most major thoroughfares." Item # 6 Page 5 of 6 4) Include the maximum heights of the buildings in the Notes and Conditions. 5) Correct S.H. 127 to S.H. 121 under the Site Plan title block, and correct the lot designation from Lot 2 to Lot 2R. 6) Delete the sign note along S.H. 121. It appears to be an existing sign that is not intended to be apart of the official PD Site Plan. Rectify all inconsistencies in the designation of Lot 2R, not Lot I1R. 8) All plans need to be consistent with regard to fire hydrant locations. 9) All fire hydrants need to be within three to five feet of the fire lane. 10) Correct the spelling of accordance on all Elevation Sheets. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Departmental comments 2) Site Plan 3) Landscape Plan ( 2 sheets) 4) Building Elevations (6 sheets) Page 6 of 6 Item # 6 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Vista Point IL Lot Block Replat P & Z HEARING DATE: C.C. HEARING DATE: March 16, 2006 April 11, 2006 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: Along the west side of MacArthur Boulevard, south of S.H. 121. SIZE OF AREA: 10.046 acres of property CURRENT ZONING: PD- 199-HC (Planned Development- 199-Highway Commercial) REQUEST: Replat approval to revise the locations of fire lanes to allow the development of three buildings containing 37,800-square feet, 41,475-square feet and 36,250-square feet, respectively APPLICANT: Christopher Gardner Jackson Shaw Company 4890 Alpha Road, Suite 100 Dallas TX 75244 (972) 628-7421 FAX: (972) 628-7444 Eric Hauglie Pacheco Koch 8350 N. Central Expressway Dallas, 'IX 75206 (972) 235-3031 FAX: (972) 235-9544 HISTORY: The subject property was originally part of Lot 3, Block G, a 49.20-acre tract within the Vista Ridge Addition. The property lies within Demon County and was part of the City of Lewisville when the first plat was recorded in September of 1986. Since that time, the City of Coppell annexed this and other portions of the Vista Ridge Business Park. Page 1 of 4 Item# 7 TRANSPORTATION: In December 1999, a request for a PD for a gas station, convenience store and car wash on 1.5 acres at this corner of S.H. 121 and MacArthur Boulevard was denied by the Planning and Zoning Commission, and it was not appealed to City Council. In September 2001, City Council approved a Site Plan and Final Plat to allow for the construction of a one-story, 71,000-square- foot office building on seven acres of this 26-acre parcel of land. The Site Plan would have expired September 11, 2003; however, on September 9, 2003, Council approved a six-month extension. This Site Plan expired in March 2004. On April 13, 2004, Council overruled staff's and Planning and Zoning Commission's recommendation for denial and approved the Concept Planned Development to allow the construction of 210,000-square feet of office/warehouse/assembly buildings and five retail pad sites. Council also approved SUP-1211 for a gas station and car repair on Lot 4 of this PD. In July 2004, Council approved PD-199R-HC, which attached a Detail Site Plan to Tract 1 to allow the construction of the first phase of this planned development, which included three office/assembly/ warehouse buildings with a total of 93,550-square feet. Phase 1 is currently fully constructed and is in the process of being leased. In April 2005, Council approved a Detail Plan to allow the construction of a bank facility on Lot 5 of this development. Bank of Texas should be open in the near future. An Amending Plat was approved in May 2005, which revised the location of various fire lanes, added lot dimensions and updated the owner information. During the same meeting, Council approved a request to re-establish S-1211 permitting the development of a gas station, car wash and car repair facility on Tract 4 of this PD. S.H. 121 is under construction to freeway standards with access roads within 450 feet of right-of-way. Forest Hill Drive is a residential street built within 50 feet of right-of-way. Page 2 of 4 Item # 7 SURROUNDING LAND USE & ZONING: North - S.H. 121; City of Lewisville South - residential, single family; PD-132-SF-9, The Peninsulas of Coppell, and PD-149-SF-7, Vistas of Coppell East - Bank of Texas (currently under construction) and vacant property; PD-199-HC (Planned Development-199-Highway Commercial) West- three office/warehouse buildings; PD-199R-HC (Planned Development-199 Revised-Highway Commercial) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for mixed- use development, including retail/commercial, office parks, schools, churches and other compatible non-residential uses. DISCUSSION: The purpose of this Replat is to adjust the alignment of the fire lanes to serve the development as indicated on the Detail Plan. As discussed in the review of the Detail Site Plan, access through the two driveways onto Forest Hill Drive is limited to vehicular traffic. Large, 18-wheel trucks are prohibited due to the "headache bars" being erected. Therefore, fire trucks also may not use these driveways. These driveways need to remain as mutual access easements, but the fire lane designation must be removed from the plat. When the Replat and Amending Plat were approved, there were unresolved issues relating to locations of various driveway and deceleration lanes. Approvals were needed from both TxDOT and the City of Lewisville. It has since been determined that the right-of-way for the deceleration lane along S.H. 121 to serve the eastern-most driveway will not be permitted by TxDOT. Therefore, if the applicant so chooses, this R.O.W. could be abandoned via this Replat due to the fact that this deceleration lane is in the City limits of the City of Coppell and w~ established previously by plat. Additional landscaping could be provided in this area. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of Vista Point II, Lot 2R, Block A, subject to: 1) Correct the designation of the western-most driveway on Forest Hill Drive to be a 30' mutual access easement (not fire lane), as recorded on Replat filed in Cab. V, page 952, and as reflected on the Amended Plat filed in Cab. W, page 598. Item # 7 Page 3 of 4 2) Correct the name of the plat in the City Secretary's signature block. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS: 1) Department comments 2) Replat Page 4 of 4 Item # 7