Loading...
W Sandy Lk Addn-LR051116HEED I E~:l--II:~i I r-I ~" E I=llr-I E~i GEOTECHNICALAND [~ F~ r--i L.J P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Sandy Lake 121 944 Sandy Lake Road Coppell, Texas REPORTED TO: MC il Development Company, Ltd. 3811 Turtle Creek Blvd, Suite 730 Dallas, Texas 75219 ATTN: Mr. Richard Crow CONTRACTOR: McFadden & Miller REPORT NO. 186 REG PROJECT NO. 12130 SAMPLE DATE: 10-19-05 TECHNICIAN: D. Fortenberry PAGE: 1 of 1 Location of Sample Set Number I Location Paving: 675'N, 100'W of SW bldg. corner Paving: 510'N, 50'W of SW bldg. corner Paving: 590'N, 75'W of SW bldg. corner Design Information Source of Concrete I Mix Identification TXI 8273 Test Results Quantity Represented 130/330 240/330 320/330 Specified Strength p.s.i. 4000 Compressive Average Strength p.s.i. Strength p.s.i. Set Cylinder Age@ Total Load No. ID Date Tested Test lbs. 1 5230 10-26-05 7 91240 5230 11-16-05 28 117740 5230 11-16-05 28 114180 5230 Hold H 2 5231 10-26-05 7 97400 5231 11-16-05 28 113070 5231 11-16-05 28 119370 5231 Hold H 3 5232 10-26-05 7 82990 5232 11-16-05 28 97580 5232 11-16-05 28 103250 5232 12-14-05 56 323O 4170 4040 4110 3450 4000 4220 4110 2940 3450 3650 355~- Cylinder Data Set Cylinder No. I ID 1 5230 2 5231 3 5232 Time of Slump Sample Air Temp. 6.5 8:40AM 72 7.0 10:35AM 77 6.5 11:40AM 79 Concrete Air Ticket Temp. Entrainment Number 82 4.2 140060 86 4.4 140258 89 4.8 140356 Mail Distribution: (1) MC II Development Company, Ltd/ Mr. Richard Crow (1) Halff Associates/Mr. Dave Littleton (1) Azimuth Architecture/Mr. John Taylor (1) McFadden & Miller/Mr. Jon Jacobson Submitted by: REED ENGINEERING GROUP, LTD. Arthur Etherly, III Manager, CMT AE/Inc 2424 STUTZ DR · SUITE 400 * DALLAS, TX 75235 ,* TEL [214] 350 5600" F^X [214] 350 0019