Loading...
W Sandy Lk Addn-LR051108GEOTECHNICAL AND G F=I D I I F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Sandy Lake 121 944 Sandy Lake Road Coppell, Texas REPORTED TO: MC II Development Company, Ltd. 3811 Turtle Creek Blvd, Suite 730 Dallas, Texas 75219 ATTN: Mr. Richard Crow CONTRACTOR: McFadden & Miller REPORT NO. 173 REG PROJECT NO. 12130 SAMPLE DATE: 10-11-05 TECHNICIAN: D, Fortenberry PAGE: 1 of 2 Location of Sample Set Number I Location I Quantity Represented 1 Paving: 80'S, 130'W of SW bldg. corner 110/400 2 Paving: 180'S, 130'W of SW bldg. corner 210/400 3 Paving: 140'S, 50'W of SW bldg. corner 340/400 Desitin Information Source of Concrete I Mix Identification TXI 8273 Specified Strength p.s.i. 4OOO Test Results Set Cylinder Age@ Total Load Compressive Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 4924 10-18-05 7 105450 3730 4924 11-08-05 28 131250 4650 4924 11-08-05 28 128500 4550 4600 4924 Hold H 2 4925 10-18-05 7 107990 3820 4925 11-08-05 28 131340 4650 4925 11-08-05 28 131050 4640 4925 Hold H 3 4926 10-18-05 7 88100 3120 4926 1%08-05 28 114070 4040 4926 11-08-05 28 119830 4240 4926 Hold H 465O 4140 2424 SfUTZ DR ,. SUITE 400 * DALLAS, TX 75235 · T~L [214] 350 5600 · F^X [214] 350 0019 REPORT NO. 173 REG PROJECT NO. 12130 SAMPLE DATE: 10-11-05 PAGE: 2of2 Cylinder Data Set Cylinder Time of No. I ID Slump Sample Air Temp. 1 4924 3,75 8:30AM 67 2 4925 5.25 10:00AM 70 3 4926 5.25 12:15PM 76 Concrete Air Ticket Temp. Entrainment Number 77 3.8 134368 79 4.2 134507 81 4.8 134722 Mail Distribution: (1) MC II Development Company, Ltd/ Mr. Richard Crow (1) Hale Associates/Mr. Dave Littleton (1) Azimuth Architecture/Mr. John Taylor (1) McFadden & Miller/Mr. Jon Jacobson Submitted by: REED ENGINEERING GROUP, LTD. Arthur Etherly, III Manager, CMT AE/Inc