Loading...
Amberpoint BP 2R-LR060310CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0182 Service Date: February 8, 2006 'll"err con 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date:March 10, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 3:40pm Plant: 7 Supplier: Lattimore Truck No: 956 Ticket No: 7161059 Mix i.D. No.: 1851 WaterAdded Onsite Before Test: 0Gallons Water Added Onsite After Test: 0 Gallons Sample Information Date Cast: February 8, 2006 Technician: Eric G. Jernigan Weather Conditions: Sunny, clear, nice Accumulative Yards: 10/10 Placement Method: Direc~ Discharge Sample Locations: On NW Inlet Placement Location: Water Main, Inlet on N side of jobsite (NE & NW) Time: 4:30pm Batch Size (cy): 10.00 Field Test Data Test Result Slump, inches: 4.25 Air Content, %: 3.9 Concrete Temperature,o F: 72 Ambient Temperature,o F: 73 Plastic Unit Weight, pcf: Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 I 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Specification Test Method ASTM C143 ASTM C231 ASTM Cl 064 ASTM Cl 064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/15/2006 7 103,920 3,670 02/15/2006 7 104,710 3,700 Average (7 Days) 3,690 03/08/2006 28 136,700 4,830 03/08/2006 28 133,660 4,730 Average (28 Days) 4,780 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Eric G. Jernigan Repod Distribution: (1) Transwestern Commercial Services (1) Tech,iStructures (1) City of Coppell TX (1) Rogers O'Brien Construction Co Reviewed by: (1) City of CoppelJ TX . Abusaad, P.E. (1) O'Brien & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0061 Service Date: January 11, 2006 'lrerracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date:March 10, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No,: 94051418 Material Information Specified Strength: 4200 psi ~ 28 Days Batch Time: 1:34pm Plant: 6 Supplier: Lattimore Materials Co. Truck No: 1109 Ticket No: 626867 Mix I.D. No.: 1851 Field Test Data Test Result Slump, inches: 5.25 Air Content, %: 4.7 Concrete Temperature,o F: 71 Ambient Temperature,o F: 73 Plastic Unit Weight, pcf: 140.4 Laboratory Test Data Set Specimen Diameter NO, Sample Information Date Cast: January 11,2006 Time: 2:35pm Technician: Daniel J. Drogos Weather Conditions: Sunny, windy Accumulative Yards: 10 Placement Method: Bucket Sample Locations: inlet Warls Placement Location: Water Drain Inlet at the corner of Northpoint and Sandy Lake Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Area ID (inches) (scI. inches) 1 1 6.00 28.27 01/18/2006 7 106,420 3,760 1 2 6.00 28.27 02/08/2006 28 153,310 5,420 1 3 6.00 28.27 02/08/2006 28 139,870 4,950 Average (28 Days) 6,t90 1 4 6.00 28.27 03/08/2006 56 149,520 5,290 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Daniel J. Drogos Repod Distribution: (1) Transweslern Commercial Services (1) TechniStructures (1) City of Coppell TX (1) Rogers O'Brien Construction Co Reviewed by: (1) City of Coppell TX H~ aid, P E (1) O'Brien & Assoc ' ' ' Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. REPORT OF SOIL-LIME MIXTURE PULVERIZATION ' rl!!ffiilcon 8901 Carpenter Fmc7., Suite #100 Dallas, Texas 75247 (214-630-1010 Date of Service: Client No.: Client: 03/10/06 50854 Transwestem Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0262 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Contractor: Test Location: Rogers-O'Brien Construction Building #5 Test Method: NTCOG Specification Requirements: Minimum Passing '1-3/4" Sieve: ] 00°/o Minimum Passing ~ Sieve: 60% Sample Condition: Field Moist 1-3/4" SIEVE tg4 SIEVE TEST LOCATION % PASSING % PASSING NO. 1 300' W & 20' S of NE comer of Building 100 61 2 220' W & 40' S of NE comer of Building 100 64 3 100' W & 25' S of NE comer of Building 100 65 4 60' S & 50' W of NE comer of Building 100 70 5 15' W & 20' S of NE comer of Building 100 65 6 75' S & 150' W of NE comer of Building 100 62 7 !70' W & 95' S of NE comer of Building 100 65 8 ~00' W & 95' S of NE comer of Building 100 70 9 25' N & 100' W of SE comer of Building 100 70 l 0 20' N & 210' W of SE comer of Building 100 72 Comments: Technician: F. Morillo Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell TX (1) City of Coppell TX 309pdr (1) Rogers O'Brien Construction Co (1) O'Brien & Assoc (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager This report is exclusively for tile use of the client indicated above and shull not be reproduced in full without written approval of Tetracon.