ST9905-CS060316I Suzan Taylor - Re: Bethel Road Page 1 ] From: To: Date: Subject: "Loretta Mokry" <lmokry@apaienv.com> <staylor@cJ.coppell.b(.us> 3/16/2006 5:18:05 PM Re: Bethel Road Suzan, As it happens, I went by the Bethel Road project site yesterday evening on my way back to Lewisville after bouncing back and forth between meetings. I saw the work that had been done on the big culverts to bring the storm runoff to the upper end of the channel there at Freeport Parkway. Was going to give you a call tomorrow to see what the schedule was for the rest of the project and find out if the design had been finalized yet. I went ahead and took pictures of the section that was finished. It did look nice. Are you planning to plant the finished area now or wait until all of it is done? Take care, Loretta Loretta E Mokry Senior Environmental Scientist Alan Plummer Associates, Inc. 10060 N. Dowling Rd. College Station, Texas 77845 (979) 694-7619 home office (817) 845-3280 cell (979) 694-7619 fax (call first) Through Fort Worth office (817) 806-1700 (817) 870-2536 FAX <loretta@apaienv.com> www. apaienv.com >>> "Suzan Taylor" <staylor@ci.coppell.tx.us> 3/16/2006 3:35:14 PM >>> Loretta: I know that you think that Bethel Road has been forgotten but we are slowly making progress. We hope to advertise in July 2006. We met with one of the landowners about the drainage easement and he is agreeable we just have to work out the details. We will meet with the other landowner next week and hopefully work out something with them. TranSystems has basically finished the plans but I found several mistakes that need to be corrected before I send them to you so that you can get them to the Corps. We have finished constructing a portion of the channel to the south of Bethel Road and it looks really nice. I will get back with you when we have these issues finalized. Suzan