Loading...
Park West CC(02-2)-LR060314E NVI~,ONMEGN~~I~/LI~I~ r--i II p CONCRETE CYLINDER TEST REPOR'I Park West Commerce Center I~elt Line Road and Alri.,= Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 A'i'TN: Mr. Bobby Parat CONTRACTOR: Cadence McShane Corporation Location of Sample Set Number I Location 1 Belt Line Rd. Turn Lane: 30'N, 10'W from SE corner of left turn lane REPORT NO. 234 REG PROJECT NO. 12468 SAMPLE DATE: 03-07-06 TECHNICIAN: S. Allen PAGE: 1 of 1 I Quantity Represented 20/50 Design Information Source of Concrete I Mix Identification TXI 8205 Test Results Specified Strength p.s.i. 4000 Set Cylinder Age @ No. ID Date Tested Test 1 9153 03-14-06 7 9153 04-04-06 28 9153 04-04-06 28 9153 Hold H Total Load lbs. 114200 Compressive Average Strength p.s.i. Strength p.s.i. 4040 Cylinder Data Set I Cylinder Time of Concrete No. ID Slump Samp e Air Temp. Temp. 1 9153 2.5 9:30AM 73 84 Air Ticket Entrainment Number 3.5 215879 Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Parat (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Nodhwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Odginal Signed By Arthur Etherly, III Manager, CMT AE/Inc 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,* T~L [214] 350 5600 '* ~AX [214] 3500019