Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Vista Point II 3-7-LR051028
COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Scou & }{cid Ocncufl (imtrm_lors, PROJECT: \ ism Point ]l Lois CONCRETEINFORMATION Sample Date: ](}2],:)5 Project No.: MO5 g42 CONTRACTOR: North Bomanite. Inc TICKET NO.: 142082 AMBIENT TEMP. (°F): 06 CONCRETE TEMP. (°F): 80 TIME BATCHED: 9:11 a.rn TIME SAMPLED: 10:30 a m WEATHER CONDITION: Coudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 128 / 580 MIX ID NUMBER: B8274 AIR (%) (ASTM C-231) 4.9 WATER ADDED (gal): 0 SLUMP (inches) (ASTM C-143) 3 ~/~ S~amped concrete paving, drive approach at State Hwy 121 servlceload CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches DATE TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE TESTED I (Pounds) STRENGTH (psi) STRENGTH (psi) ~ G28,'05 109070 3860 11 rl 8/05 138240 4890 CYLINDER AGE NUMBER ~ (Days) I B I 28 'C 28 ~ I1,1805 ' 140510 4970 ~D ! Hold Hold Curing: 4000 / 28 days I ',,I~.(;O(ONSI..L1ANI%,I (. (hcS<ed By: ,~ 11440 Rceder Rd - Dallas, q X 75229 lei (2/4) 352 4100. Fix (2 4', 352 4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: S~ott & Rcid..Gel]erat (?{mu:~c PROJECT: ~._~'a ~c~mt It-- 1.ors 3? -~ ~-7'L~'~ '"qcwisville CoppelI, Texas Sample Date: lO,_l O> Project No.: M05 842 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE NFORMATION North Bomanite, Inc 142082 66 80 9:11 a.m fl0:30 Cloudy Stamped concrete paving, CONCRETE SUPPLIER: TXI PLANT/TRUCK: 128 / 580 MIX ID NUMBER: B8274 AIR (%) (ASTM C-231) 4.9 WATER ADDED (gal): 0 SLUMP (inches) (ASTM C-143) 3 1/2 drive approach at State Hwy 121 service road CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER (Days) ,' TESTED (Pounds) j 10/28/'05 109070 28 ] 11/18/05 138240 28 ! 11d8/05 140510 Making & ASTM C~1 Testing Methods Curing: AGE [ DATE TOTALLOAD COMPRESSIVE STRENGTH (psi) 3860 489{) 4970 1C 1D I ASTMC-143 ASTM ; 39 SPECIFIED COMPRESSIVE STRENGTH (psi) 4000 / 28 days Pacneco Koch Consultirlg Engineers E,-ik Hauglit P E San Saba ConstqJction, Inc !,k)bert B6serra F \I~.GO CONSUI/I :\NTS, IN(?, (hocked By: ~ /