Vista Point II 3-7-LR051024 t / [4(I Recdcr ?,d · Ddlas 15( 75229
1e1.(2[4)/52-4/00 · Fax (214/352-481]
Relmrt of
Reinforcing Steel Observation
('licnl: ScoU&Reid(]cncral('ontracmrs, Inc.
Project: Visul Point 11 Iots g-7. Block A
Date of Service: 10,24:05
Project No.: M05 $42
I ocamions and Items Ohscr;ation: Mac~Xrlhu~ Boulcx ard south buund right tuna lane north point ta
smith approach Rcmlbrcmg Nice[
C'ohmm Tics
l",:lcinB D~ mings '~cs IhnI cngfl] and 5cs Piopclly l'ied N'A
hpptox exl ~]lape and Spaced
[)lOpCl [~[[1 Stiu'up Spacing N'A
Ba: Su~c ~c's Placcmem ~ Yes and Type
l~:. (~ladc hcs Pu~pcfi5 lied 5cs lapped Splices
l;mpc~ Bm Yes Mechanical
[<espcctfkdly Submitted,
Fargo Consullants Inc.
I c, chnicmn: Moc Mumm
( heckcd b y://~4
Pacheco Koch Consulting Engineers ErikHauglie, PE.
San Saba Construction Inc Robed Beserra
City of Coppell Larry Davis