Loading...
Vista Point II 3-7-LR051006 11440 Rccdcr lid. · Dallas. IX 75229 Icl (214) 352-4100 · Fax (214) 352 4811 REPORT OF FIEI.D COMPACTION I'c,,ted l:or: Scot! & Reid General ('ontlaclors. Inc. Project: Vista Point 11 I.ots3-7 lex~isxillc Coppcll. Icxas Date Performed: 10/06/05 I:CI Project No.: M05 842 Dcnxit5 Poi 4SlX. 1 l) 2922 \lotsmIc ci ASIM D 3017 MOISTI I/E/I)~ NSITY RI(I~ATIONS IN-lq.X('[ TEST RESI71, I'S ' ' MacAuthur Boutcxard deceleration right turn lane, I (5' 17R S(; south fi'om north point (south bound lane) Retest I}wtcst number 1.g};'rclx~r[d icc 100q'05 MacAuthur Boulevard deceleration right turn lane, 200' 1NR 5(~; south fi-om north point (south bound lane) Retest ~br test number 14F report dated 10 05,'05 ~ MacAuthur Boulevard deceleration right hwn lane, ]OR S(~ north fi-om south point (south bound hmo) [ Rctcsl [bt-test number 15F report dated 1005,05 ' ~ MacAuthm Boulcxard dccclcralion right turn lane. 45 20R S(} j north from south point (south hotrod lane) ~ Retest fbr test nun~bcr 16F report dated I0'05'05 Gauge Manuf':Humboldt Gauge Model: HS 5001 Prob~' Dcplh; !) ii,thcs Optinmm · Maximum 99.4 13.5 116.4 ] 99.1 14.7 116.6 99.2 No. X'lmsturc (P(Fi 2 15.5 116.8 2 13.6 I 13.1 l'cclmician: VcI')lOll Robinson Checked By': ~ ])tq ibuIIOl~ Scott & Reid General Contractors, ]nc Kenny Newman Pacheco Koch Consulting Engineers ErikHauglie, P.E San Saba Construction, Inc Robert Beserra Cityo~Coppell Larry Davis City of Lewisville - Eric Schrack 440 Rccde~ Rd · Dallas, ]X 7522') ~214}352 4100. Fax (214}352 4811 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Scott & Reid General (kmtmctors, Inc PROJECT: Vistal>o/n!ll Lois]-~ CONCRETE INFORMATION Sample Date: 092905 Project No.: M05-842 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: lOCATION OF PLACEMENT: San Saba Construction 3201999 80 77 1:15pm 210 pm CONCRETE SUPPLIER: LMC PLANT/TRUCK: 3 / 1082 MIX ID NUMBER: 5409 AIR (%) (ASTM C-231) WATER ADDED (gal): 0 Cloudy SLUMP (inches) (ASTM C-143) 3 aA Sidewalk replacement at north side of Forest Hill Drive approximately 200' west of MacArthur Boulevard CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER AGE DATE COMPRESSIVE SPECIFIED COMPRESSIVE NUMBER (Days) TESTED I B 28 1C _ 28 1D Hold Spec ficahons ,Making & Cudng: 10/06/05 10'27/05 Hold ASTM C 3~ 10'27/05 104720 TOTAL LOAD (Pounds) STRENGTH STRENGTH (psi) (psi) 82260 2910 3000 / 28 days 105440 3730 3700 Testing Llethods ASTMC-143 ASTMC39 Pacheco Koch Consulting Engineers Erik Hauglie Pi: Clvcf(7oppell :arty Daws FARGO CONSULTANTS? (']lcc'~tcd By:~/'~