Vista Point II 3-7-LR050912 II 44(I Rccder F.d · Da[his, IX 75229
let (214)152 4100o[ax(214) 352 4811
Report of
Reinforcing Steel Observation
( lient: Scott & Reid General Contractors, Inc.
Project: Vista Point Il Lots 3-7, Block A
Lcwisville / Coppcll, Texas
Date of Service: 9/12/05
Project No.: M05-842
I~ocations and Items Observation: Driveway approach at lhvy. 121 serxice road / Reinforcing Steel
Items I Items i Items I Conforming
Ins}~ectcd ~ Conforming InspectedI Conforming Inspected I
Cohmm Ties
Placing Drax~ings i Yes Bal I~cngth and ~'cs Pmpmly Tied / N/A
Approved ~ Shape ~ and ~pacEd
I
Bar Size ~ Yes Proper Bar Yes Stirrup Spacing N/A
Pl~ceme?t I ~ld T~e
Bm (trade [ Yes Properly I'ied ' Yes Lapped Splices I Yes
~ ~5~x~cl Bars m ~
Ba~ ('lean I Yes Place Yes Welded Splices I N,A
~ Plopc~ Bar I Mechanical
l.ol m (7lean ~' N"A Supports i: Yes Splices
N/A
Number ct Bars ] Yes Proper Cove~ i Yes I
5'.1 lmticam,~ no! apph'cable
['cchnician: Ben Avraham
Respectfully Submitted,
Fargo Consultants Ine.
Checked by: _~.~__
/
Distribution: Scott & Reid General Contractors, Inc. Kenny Newman
Pacheco Koch Consulting Engineers - Erik Haugiie, P.E.
San Saba Construction, lnc. RobedBeserra
City of Coppell Larry Davis