Loading...
Vista Point II 3-7-LR050912 II 44(I Rccder F.d · Da[his, IX 75229 let (214)152 4100o[ax(214) 352 4811 Report of Reinforcing Steel Observation ( lient: Scott & Reid General Contractors, Inc. Project: Vista Point Il Lots 3-7, Block A Lcwisville / Coppcll, Texas Date of Service: 9/12/05 Project No.: M05-842 I~ocations and Items Observation: Driveway approach at lhvy. 121 serxice road / Reinforcing Steel Items I Items i Items I Conforming Ins}~ectcd ~ Conforming InspectedI Conforming Inspected I Cohmm Ties Placing Drax~ings i Yes Bal I~cngth and ~'cs Pmpmly Tied / N/A Approved ~ Shape ~ and ~pacEd I Bar Size ~ Yes Proper Bar Yes Stirrup Spacing N/A Pl~ceme?t I ~ld T~e Bm (trade [ Yes Properly I'ied ' Yes Lapped Splices I Yes ~ ~5~x~cl Bars m ~ Ba~ ('lean I Yes Place Yes Welded Splices I N,A ~ Plopc~ Bar I Mechanical l.ol m (7lean ~' N"A Supports i: Yes Splices N/A Number ct Bars ] Yes Proper Cove~ i Yes I 5'.1 lmticam,~ no! apph'cable ['cchnician: Ben Avraham Respectfully Submitted, Fargo Consultants Ine. Checked by: _~.~__ / Distribution: Scott & Reid General Contractors, Inc. Kenny Newman Pacheco Koch Consulting Engineers - Erik Haugiie, P.E. San Saba Construction, lnc. RobedBeserra City of Coppell Larry Davis