Vista Point II 3-7-LR050909 I1440 Rcede~ Rd. · Dallas, TX 75229
J~( i2i41 }~2L4i6i)· Fax (214) 352-4811
REPORT OF FIELD COMPACTION
l'ested For: Scott &Rctd General (onttactors,
Project: Vista Point II - Lots 3-7
Lewisville / Coppell, Texas
Date Performed: 09/09/05
FCI Project No.: M05-842
l)ensit>: Pal ASTM D-2922
x, toistuie: Per ASTM t)-3017
'rest Mode (D[ ' BS):BS
MOISTI :RE/DENSITY REI,ATIONS
Material Description Optimum
~ No. J Moisture (%)
t' * Flex Base (screened crushed concrete) . 13.5
INT-PLACE TEST RESULTS
~ ~ D~Si~'e approach and lh~y 12I, 10' cast l~om ~vest point -:
7R SG of deceleration lane 2 13.8
Retest for test mm~bcr OF report dated 9/09/05 (a.m. trip~
Drive approach and H~y 121 service road
8R ~ G (center line of drive approach) v 14.4
Gauge M an u £ :]2h4_mbo] d~t
Gauge Model: HS-5001EZ
lhobe Depth: 0 inches
Maxilnlllll
Density (PCF)
117.5
I)ry
Density
(PCF)
115.6
113.6 96.7
Retest for test number 5F report dated 9/09/05 (a.m. trip)
9 SG Drive approach and Hwy 121 service road, 25' cast I?om 14.0 114.3
~ L ~ ~vest~o~nt of declaration lane
r {5 ~ :R I ISI'N[IMBFRINDI(AIISR/1ESI I)Ak;I[RTESTNI;MB~I~isICS~FF~%F~J~f~[ [OCOMPLY%VITH PROIEC~ REQUIREMENIS
Technician: Chris Currier
Checked By:
Pacheco Koch Consulting Engineers - Erik Hauglie, PE
San Saba Construction, Inc. - Robed Beserra
City of Coppell - Larry Davis
1440 Re[der Rd · [)alias. IX 5~29
Icl /214/352 410g. Fax (2[4) 352 4811
REPORT OF FIELD COMPACTION
Tested For: Scott & Reid General ContractDrs, Inc.
Project:. V'ista Point II Lots o-,' '~
Lcwisx ilIc/ Coppell, Texas
Date PertBrmed: 09/09/05
FC1 Project No.: M05 842
Dcnsil% Pe~ ASTM D52922 Gauge Manuf.:Hun~boldt
MoismIe Pcj A_SI'M D-3017 Gauge Model
lest Mode ID'I BS):DT Probe DepthL~_inches
MOIS FI !RE~DENSITY ~LA I IONS
Proctor Optimunl Maxinmm Dry
~ Material l)escription
[ No. , Moisture ...... (%) Density (PCF)
2 Flex Base (screened crushed concrete) ]5~
IN-PLACE I EST RES[ LTS
, Lift , / I
, i : Dr,ve approaca and H,,v 121 se, v,cc,oad ~ I ....... ~...
~ 5F SG : ~ - ' g ~ J IU4
~ - (center lineofdrivc approach)
~J . ]D'vcapp-oacaaac Ih, v 121se-v cc road, 10'east I ~ ~ ......
' i ' ~l'Olll west nomt ol deceleration lane Oidnve approach , ~ ,
['cchtfician: Dominic Gonza/es
Chcck[d By: /~
Pacheco Koch Consulting Engineers - Erik Hauglie, P E
San Saba Construction, In[ - Robed Beserra
Cit? of Coppell Larry Davis