Loading...
Vista Point II 3-7-LR050830I I440 Rccder Rd · Dallas. I X 75229 (214) 3~2 410ii. F~x i214~i~5: 4Sll Report of Reinforcing Steel Observation Client: Scott & Reid General Contractors, Inc. Project: Vista Point Il Lots 3-7, Block A Lewisville/( oppell, Texas Date of Service: 8/30/05 Project No.: M05-842 Locations and Items Observation: Paving for fire lane Reinft~rcmg Steel Items [ Conforming Items I Conforming Items I Inspected Inspected Inspected ! Conforming ; Colurm~ Tics Placing Drawings [ 5es Bar Length and I Yes P,operly Tied N/A Approved Shape and Space~ [ Proper Bar i Stirrup Spacing Ba~ Size Yr's Placcmcnl ~ Yes and 'I'~e Bm (ha(lc Yes }hopcrly Tied Yes lapped Splices I Yes I)ox~cl Bars in Yes Welded Splices [ N/A Bm (lean . Yes Place [ ITel 11] Clean NA Propm Ba~ Yes Mechanical [ N/A Sopports I Splices , Number of Bars ~ Yes Proper Cover ~ Yes I applicable Technician: Daniel Keller Respectfully Submitted, Fargo Consultants Inc. Checked by/fi//{/ Distribution: Scott & Reid General Contractors, Inc. - Kenny Newman Pacheco Koch Consulting Engineers - Erik Hauglie, PE. San Saba Construction, Inc. - Robert Beserra City of Coppell - Larry Davis 1440 Recdcr Rd. · Dallas, TX 75229 (~1417~2-d100'Fix(214) 152 4811 Tested For: Scott & Reid Gencral ( ontracto 's, htc. Project Name: Vista Point li Lots 3-7, Block A Lewisville/Coppcll, 'I cxas Date Test performed: 9/02/05 Type/Grade: Crushed Concrete Screenings / 1 Sample Location: On site stockpile (imported) Date Sample Picked Up: 8/30/05 FCI Project No. M05-843 Report of Wet Ball Mill / l,iquid Limit / Plasticity Index Test Sample Wet Ball Mill (%) 33 Max. Increase in passipg No. 40 (%) 12 Max. IJquid Lilnit (I,L) 24 Max. Plasticity Index (PI) 6 Specified 40 max. 20 max. 35 max. 10 max. Results indicate that the sampled material meets ¥ket ball nqill, Liquid Limit and Plastic Index requirements for Grade I of Tex I)Oq Item 247 l'echn c an Gary Moore, CA-LT. FARGO CONSULTANTS, INC. Checked By: /~/~ I)istrihunon: Scott & Reid General Contractors, ]nc. - Kenny Newman Pacheco Koch Consulting Engineers - Erik Hauglie, P.E. San Saba Construction,/nc, - Robert Beserra City of Coppell Larry Davis