Vista Point II 3-7-LR050831 11440 Reedcr R_d · Dallas, TX 75?29
'lei (214) 352-4100 · Fax (214) 352 4811
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Scott &Rcid Gcneral Contractors, Inc
PROJECT: Vista Point I1 Lots 3-7
Lcwisvillc / Coppell, Texas
CONCRETE INFORMATION
Sample Date: 08/24/05
Project No.: M05-842
CONTRACTOR: Harrison Structures
TICKET NO.: 3200140
AMBIENT TEMP. (°F): 101
CONCRETE TEMP. (°F): 93
TIME BATCHED: 3:33 p.m
TIME SAMPLED: 4:15 p.m.
WEATHER CONDITION: Partly Cloudy
LOCATION OF PLACEMENT:
CONCRETE SUPPLIER: LMC
PLANT/TRUCK: 3 ! 1045
MIX ID NUMBER: 1701
AIR (%) (ASTM C-231) 4.1
WATER ADDED (gal): 0
SLUMP (inches) (ASTM C-143) 4 ½
Sanitary Sewer manhole, Line SS-1 station 0+00
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE
NUMBER (Days) TESTED (Pounds) STRENGTH STRENGTH
(psi) (psi)
lA 7 8/31/05 101930 3610 _ 4200 / 28 days
1 B 28 9/21/05 130320 4610
1C i 28 9/21/05 127540 4510
1D i Hold Hold _
Specifications: Making & ASTM C 31 Testing Methods: ASTM C-143, ASTM C-39
Curing:
Technician: Ben Auraham
Scott & Reid General Contractors, Inc -- Kenny Newman
Pacheco Koch Consulting Engfneers Erik Hauglie, P.E
San Saba Construction, Inc. - Robed Beserra
City of CoppeJl - Larry Davis
FARGO CONSULTANTS, INC.
Checked By://