Loading...
Vista Point II 3-7-LR050726 11440 Reeder Rd, · Dallas, TX 75229 Tel. (214) 352-4100 · Fax (214) 352-481 I REPORT OF FIELD COMPACTION Tested For: Scott & Reid General Contractors, Inc. Project: Vista Point 1I - Lots 3-7 Lexvisville / Coppell, Texas Date Performed: 07./26/05 FC1 Project No.: M05-842 DensiU,: Per ASTM D-2922 Moisture: I~.c!LA~TM D-3017 'lest Mode (D'I / BS): DT MOISTURE/DENSITY RELATIONS Gauge iVlanuf.:Humboldt Gauge Model: HS-5001EZ Probe Depth: 12 roches Proctor , Material Description I No. ~ [ Dar 5~ayandB , 1 k rown Silty Clay IN-PLACE TEST RESULTS 5 i FG-2' Storm drain. Line B station 0'75 6 FG-] ' , Stoma drain Line B station 0 ¢80 7 FG Sto~ dram Line B station 1+00 8 FG 2' Stom~ drain Line B station 2+70 9 FG-I ' Storm drain Lille B station 2+50 I 0 FG Storm drain Line B station 2450 Optimum Moisture (%) 19.5 Maximum Dry Density (PCF) 103.0 Percent Dry Moisture Density (PCF) 21.8 99.0 22.4 23.0 23.4 22.5 22.0 ~R/,,\I IFP, T[~STN[ MB[RIND[CAFESREqESI (F) AFH!R'IESI NI MBERINI)I('AII'$~'AIIIIR} TOCOMPIYWITItPROJECTREQUIREMENTS Technician: Gaw Moore, C.E.T. Checked By: _ ,~__ ....... Scott & Reid General Contractors, Inc - Kenny Newman Pacheco Koch Consutting Engineers - Erik Hauglie, P E San Saba Construction, Inc. - Robert Beserra City of Coppell Larry Davis