Loading...
Amberpoint BP 2R-LR060320CONCRETE COMPRESSIVE STRENGTHTES'r......~TES'I'..~ Report Number: 94051418.0209 Service Date: February 15, 2006 'il'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W,~-"-~_ Dallas TX 75244 Material Information Specified Strength: 4200 psi ~ 28 Days Report Dat Buildings 4, 5 and 6 Coppell, TX ct No.: 9405'1418 ~mplo Information Date Cast: February t 5, 2006 Time: 3:50pm Technician: Eric G. Jernigan Batch Time: 2:51pm Supplier: Lattimore Truck No: 980 Mix I.D. No.: 1851 Water Added Onsite Before Test: Water Added Onsite After Test: Plant: 6 Ticket No: 6271208 5Gallons 0 Gallons Weather Conditions: Sunny, clear, warm Accumulative Yards: 4/4 Placement Method: Direct Discharge Sample Locations: N Headwall Placement Location: Headwalls, sloped at SW corner of Freeport & Sandy Lake, NE entry of Amber Point Field Test Data Test Result Slump, inches: 3.25 Air Content, %: 2.7 Concrete Temperaturep F: 77 Ambient Temperature,o F: 80 Plastic Unit Weight, pcf: Laboratory Test Data Specification Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 02/22/2006 7 125,170 4,43~__.~_... 1 2 6.00 28.27 02/22/2006 7 128,970 ~ Average (7 Days) 4,500 I 3 6.00 28.27 03/15/2006 1 4 6.00 28.27 03/15/2006 28 157,700 ~ 28 151,340 Average (28 Days) 5,470 Comments: Not tested for plastic unit weight Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Eric G Jernigan Report Distribution: (1) Transwestern Commercial Services (1) TechniStructures //'~j~V~ j (1) City of Coppell TX (1) Rogers O'Brien Construction Ce Reviewed by: (1) City of Coppelf TX Hussein H. Abusaad, P.E. (1) O'Bden & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repod is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are onty applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0200 Service Date: February 14, 2006 '1 I' ffacon 8901 Carpenter Fro/y, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: March 20, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 3:20pm Plant: 7 Supplier: Lattimore Materials Co. Truck No: 1851 Ticket No: 7161230 Mix I D. No.: 1851 Water Added Onsite Before Test: 0Gallons Water Added Onsite After Test: 0 Gallons Sample Information Date Cast: February 14, 2006 Time: 4:20pm Technician: Barry Cuble Weather Conditions: Sunny, mild, winds Accumulative Yards: 8/8 Placement Method: Direct Discharge Sample Locations: See Placement Location Placement Location: Manhole Tops at St. Lat. C2, Cl, D, Line D, Vault Top; NE corner Field Test Data Test Specification Result Slump, inches: 5.50 Air Content, %: 5.8 Concrete Temperature,o F: 73 Ambient Temperature,o F: 71 Plastic Unit Weight, pcf: 144.0 Laboratory Test Data Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 02/21/2006 1 2 6.00 2827 02/21/2006 1 3 6.00 28.27 03/14/2006 1 4 6.00 28.27 03/14/2006 Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 94,160 3,330 7 91,130 3,220 Average (7 Days) 3,280 28 124,180 4,390 28 121,990 4,310 Average (28 Days) 4,350 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Barry Cuble Repod Distribution: (1) Transwcslern Commercial Se[vices (1) TechniStruclures //~ ~:~) j (1) City of Coppell TX (1) Roge[s O'Brien Construction Co Reviewed by: (1) City of Coppell TX Hussein H. Abusaad, P.E. (1) O'Brien & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials