MA FY 0405-LR051216Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of C0ppell Street Repair Project
Job #05-267, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
02.1077
16 December 2005
Pavement Services
Curb and gutter in front of 409 Hidden Valley Lane
SAMPLE DATA: SET 1
Truck No.
Ticket No.
Time Batched 11:45am
Time Sampled 11:45am
Concrete Temp. IASTM C1064) 47°F
Air Content IASTM C231) 3,1%
Unit Weight {ASTM C138)
Ambient Temp.
SET 2
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS [ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
IASTM C143) psi Strength
514 3.25 7 12/23/05
515 3.25 28 01/13/06
516 3.25 28 01/13/06
144,200 5100
188,600 6670
191,000 6?60
28-Day Average 6720
4000
TECHNICIAN:
DISTRIBUTION:
RJW (11:00am- 1:00pm)
(1) Pavement Services Corp,
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148