Loading...
MA FY 0405-LR051216Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of C0ppell Street Repair Project Job #05-267, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 02.1077 16 December 2005 Pavement Services Curb and gutter in front of 409 Hidden Valley Lane SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 11:45am Time Sampled 11:45am Concrete Temp. IASTM C1064) 47°F Air Content IASTM C231) 3,1% Unit Weight {ASTM C138) Ambient Temp. SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS [ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 514 3.25 7 12/23/05 515 3.25 28 01/13/06 516 3.25 28 01/13/06 144,200 5100 188,600 6670 191,000 6?60 28-Day Average 6720 4000 TECHNICIAN: DISTRIBUTION: RJW (11:00am- 1:00pm) (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148