Loading...
MA FY 0405-LR051214Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #05-267, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 02.1077 14 December 2005 Pavement Services Paving for curb and gutter at houses 141, 135, 134, 129, 128 and 127 Sandy Oaks SAMPLE DATA: SET 1 SET 2 MIX NO. 4000 Truck No. 2022 Cement Ticket No. Flyash Time Batched 9:15am Sand Time Sampled 9:35am in. Concrete Temp. (ASTM C1064] 56°F 1.0 in. Air Content {ASTM C231) 4.5% Water Unit Weight [ASTM C1381 Admix //1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C143} psi Strength 511 5.00 7 12/21/05 512 5.00 28 01/11/06 513 5.00 28 01/11/06 105,900 3750 139,600 4940 145~800 5160 28-Day Average 5050 4000 TECHNICIAN: DISTRIBUTION: JPB (9:00am-lO:3Oam) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351~6419 Fax (214) 351-5148