MA FY 0405-LR051206Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppeil Street Repair Project
Job #05-267, C0ppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 02.1077
DATE: 6 December 2005
SUPPLIER: Pavement Services
Curb and gutter along Hidden Valley, approx. 10' south to 15' north
of south curb of Oakbrook
SAMPLE DATA: SET 1
Truck No. 2022
Ticket No.
Time Batched 1 O: 10am
Time Sampled 10:lOam
Concrete Temp. (ASTM C1064) 58°F
Air Content (ASTM C231)
Unit Weight (ASTM C138)
Ambient Temp.
SET 2 MIX NO. 4000
Cement
Flyash
Sand
1,0 in.
Water
Admix #1
Admix //2
AEA
COtl/IPRESSIVE STRENGTH TESTS tASTM C39) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 2S-Day
IASTM C143} ps[ Strength
508 1.50 7 12/13/05 135,700 4800
509 1.50 28 01/03/06 180,800 6400
510 1.5o 28 Ol/O3/O6 180,~00 6370
28-Day Average 6390
4000
TECHNICIAN:
DISTRIBUTION:
MFM (9:30am-11:30am)
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148