Loading...
MA FY 0405-LR051205Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp, PROJECT: City of C0ppell Street Repair Project Job #05-267, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 5 December 2005 SUPPLIER: Pavement Services Curb and gutter at 143 Sandy Oak Drive and 513 Oakcrest Drive SAMPLE DATA: SET 1 SET 2 MIX NO. 4000 Truck No. 272 Cement Ticket No. Flyash Time Batched 9:40am Sand Time Sampled 9:40am in. Concrete Temp. (ASTM C1064) 43°F 1.0 in. Air Content [ASTM C231) 3.0% Water Unit Weight (ASTM C138) Admix //1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day [ASTM C143) psi Strength 505 4~00 7 12/12/05 506 4.00 28 01/02/06 507 4.00 28 01/02/06 138,300 489O 184,200 6520 184,900 6540 28-Day Average 6530 4000 TECHNICIAN: DISTRIBUTION: RJW (8:30am-10:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148