Loading...
MA FY 0405-LR051130Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #05-267, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 02,1077 30 November 2005 Pavement Services Curb and gutter east side of Hidden Valley Drive @ approx. 150'-75' north of Sandy Oak Drive SAMPLE DATA: SET 1 SET 2 MIX NO. 4000 Truck No. 2021 Cement Ticket No. NA Flyash Time Batched 8:23am Sand Time Sampled 8:24am in. Concrete Temp. (ASTM C10641 55°F 1.0 in. Air Content IASTM C231) 2.8% Water Unit Weight (ASTM C138) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C143) psi Strength 502 4.50 7 12~07~05 130,700 4620 503 4.50 28 12/28~05 164,8o0 583o 504 4.50 28 12/28105 158,300 5600 28-Day Average 5720 4000 TECHNICIAN: DISTRIBUTION: RJW (7:30am-9:30am) (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 35;1-5148