Loading...
MA FY 0405-LR051109Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp, PROJECT: City of C, oppell Street Repair Project Job ,'~5-267,, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 9 November 2005 SUPPLIER: Pavement Ser. Paving replacement on Carolina Court, west side of cul de sac, approx. 25' north of south end SAMPLE DATA: SET 1 Truck No. 2020 Ticket No. NA Time Batched Time Sampled 8:50am Concrete Temp. IASTM C1064) 79°F SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Air Content IASTM C231) Unit Weight (ASTM C138) Ambient Temp. 1.0% Water Admix #1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM Cl 43) psi Strength 496 6.75 7 11/16/05 497 6.75 28 12/07/05 498 6.75 28 12/07/05 98,70 3490 140,600 4970 14Z,Z00 5030 28-Day Average 5000 4000 TECHNICIAN: DISTRIBUTION: CDJ (8:00am-10:00am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148