Loading...
MA FY 0405-LR051103Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 3 November 2005 SUPPLIER: Pavement Ser. Southbound Royal Lane paving replaements at 500 Royal Lane, north replacement SAMPLE DATA: SET I Truck No. 2021 Ticket No. Time Batched Site Time Sampled 8:00am Concrete Temp. IASTM C1064) 67°F Air Content (ASTM C231) 2.0% Unit Weight (ASTM C138) Ambient Temp. SET 2 MiX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 490 6.25 7 11/10/05 491 6.25 28 12/01/05 492 6.25 28 12/01/05 112,400 3980 155,200 5490 153,500 5430 28-Day Average 5460 4OOO TECHNICIAN: DISTRIBUTION: CDJ (7:00am-9:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148