Loading...
MA FY 0405-LR051101Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #'0S.267 Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 1 November 2005 SUPPLIER: Pavement Ser. Paving for Royal Lane, northbound righthand lane, approx. 195%220' north of Creekview Drive and 0'-15' west of east curbline SAMPLE DATA: SET 1 Truck No. 2020 Ticket No. Time Batched 8:05am Time Sampled 8:10am Concrete Temp. IASTM C1064) 61 °F Air Content (ASTM C231 ) 3.7 % Unit Weight (ASTM C138) Ambient Temp. SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 484 7.00 7 11 ~08~05 485 7.00 28 11 ~29/05 486 7.00 28 11 ~29~05 85,500 3020 135,400 4790 136,000 4810 28-Day Average 4800 4000 TE~HNICIAN: DISTRIBUTION: jpB (7:30am-9:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214)o351-6419 Fax (214) 351-5148