Loading...
MA FY 0405-LR051027Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp, PROJECT: City of.Co.p.p_ell Street Repair Project Job #Ob-Zb-/- , Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 27 October 2005 SUPPLIER: Pavement Ser. Paving replacement northbound Royal Lane, outside lane at entrance drive to 680 Royal Lane, 0'-30' south of north end of pour SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 8:00am Time Sampled 8:00am Concrete Temp. (ASTM C1064} 65°F Air Content IASTM C231) 3.1% Unit Weight (ASTM C138) Ambient Temp. SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 481 6,25 7 11/03/05 482 6.25 28 11/24/05 483 6.25 28 11/24/05 143,900 5090 167,200 5910 172,700 6110 28-Day Average 6010 4000 TECHNICIAN: DISTRIBUTION: RJW (7:00am-9:OOam) (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148