MA FY 0405-LR050930Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
Paving, southbound Royal Lane
02.1077
30 September 2005
Pavement Ser.
SAMPLE DATA:
Truck No.
Ticket No,
Time Batched
Time Sampled
Concrete Temp. (ASTM C1064)
Air Content {ASTM C231)
Unit Weight (ASTM c13e}
Ambient Temp.
SET 1 SET 2
MIX NO,
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
464 28 10/28/05
465 28 10/28/05
131,200 4640
95,100 3360
28-Day Average 4000
4000
NOTE: Cylinders and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
1 hour lab. processing
(1) Pavement Services Corp.
(1) City of Coppelr
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148