MA FY 0405-LR050401Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: Carrollton Various Street Repairs 2004
Job 04.690, Carrollton, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2',
JOB NO.:
DATE:
SUPPLIER:
04.1022
1 April 2005
Pavement Services
Paving, southbound lane of Meadow Creek @ Lincoln St.
intersection
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. Cement
Ticket No. Flyash
Time Batched Sand
Time Sampled in.
Concrete Temp. IASTM C1064) 1.0 in.
Air Content (ASTM C231) Water
Unit Weight {ASTM C138) Admix #1
Ambient Temp. Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
194 7 04/08/05 104,000 3680
195 28 04~29~05 149,800 $300
196 28 04/29/05 iL40,800- 4980
28-Day Average $140
4000
NOTE: Cylinder and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
1 hour processing charge
(1) Pavement Services Corp.
(1) City of Carrollton
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148