Loading...
MA FY 0405-LR050401Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: Carrollton Various Street Repairs 2004 Job 04.690, Carrollton, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2', JOB NO.: DATE: SUPPLIER: 04.1022 1 April 2005 Pavement Services Paving, southbound lane of Meadow Creek @ Lincoln St. intersection SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. IASTM C1064) 1.0 in. Air Content (ASTM C231) Water Unit Weight {ASTM C138) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 194 7 04/08/05 104,000 3680 195 28 04~29~05 149,800 $300 196 28 04/29/05 iL40,800- 4980 28-Day Average $140 4000 NOTE: Cylinder and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: 1 hour processing charge (1) Pavement Services Corp. (1) City of Carrollton 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148