Loading...
MA FY 0405-LR041228Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: DATE: CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: 02.1077 28 December 2004 Paving, southbound Mockingbird Lane at intersection of Meadowlark SAMPLE DATA: SET t SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064) 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 426 7 01/O4/O5 427 28 01/25/05 428 28 01/25/05 139,700 4940 199,100 7040 182,100 6440 28-Day Average 6740 4000 NOTE: Cylinders and all information furnished by contractor. RECEIVED JAN 2 ? 2005 TECHNICIAN: DISTRIBUTION: Contractor (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148