MA FY 0405-LR041215Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: Carrollton Various Street Repairs 2004
Job 04.690, Carrollton, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
Paving, 1201 Derby Run (westbound lane)
04.1022
15 December 2004
SAMPLE DATA: SET 1
Truck No,
Ticket No.
Time Batched
Time Sampled 11 :OOam
Concrete Temp. (ASTM cloe4)
Air Content IASTM C231)
Unit Weight IASTM C138)
Ambient Temp.
SET 2
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
RECEF, E~ JAN 1 ~ ti)l)5
COMPRESSIVE STRENGTH TESTS {ASTM C391 (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143) psi Strength
139 7 12/22/04 123,600 4370
140 28 01/12/05 iSg,900 5660
141 28 01/12/05 147,70.0 522Q
28-Day Average 544Q
4000
NOTE: Cylinder and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
Contractor
(1) Pavement Services Corp.
(1) City of Carrollton
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148