Loading...
MA FY 0405-LR041213Hooper Engineering Laboratories, Inc. Construction Materials Teeting REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job //03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 02.1077 13 December 2004 Pavement Services Paving, eastbound Cambria Drive @ 422 residence SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C10§4) Air Content {ASTM C2311 Unit Weight IASTM C138} Ambient Temp. SET 1 SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) MIX NO. Cement Flyash Sand ir~. 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 41 7 7 12/20/04 41 8 28 01/10/05 41 9 28 01/10/05 120,400 4250 169,000 5980 168,100 5950 28-Day Average 5970 4OOO NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148