MA FY 0405-LR041208Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 02.1077
DATE: 8 December 2004
SUPPLIER: Pavement Services
Paving, northbound Simmons ~ 248 residence
SAMPLE DATA:
Truck No.
Ticket No.
Time Batched
Time Sampled
Concrete Temp. (ASTM C1064)
Air Content (ASTM C231J
Unit Weight (AS~rM C138)
Ambient Temp.
SET 1 SET 2
COMPRESSIVE STRENGTH TESTS (ASTM C3a)
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
RECEIVED JAN 0 7 2005
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Stren.gth 28-Day
(ASTM Cl 43) psi Strength
411 7 12/15/04
412 28 01/05/05
413 28 01/05/05
103,800 3670
163,800 5790
162,500 5750
28-DayAverage 5770
4000
NOTE: Cylinders and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
Contractor
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214),351-6419 Fax (214) 351-5148