Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA FY 0405-LR050525
CLIENT: PROJECT: Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Flex Base - Crushed Concrete and Asphalt ASTM D 698 STANDARD PROCTOR: 1) 109,0 pcf @ 14.0% Moisture LOCATION PROCTOR LIFT DATE: 25 May 2005 JOB NO.: 02,1077 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Alley Pavin,q Replacement (~ Westwood Court 239) approx. 15' N of Vanbebber Dr. 1 Fin. Sub. 11.0 121.1 111.1 240) approx. 125' N of Vanbebber Dr. 1 Fin. Sub, 10.2 119,4 109,6 241) approx. 200' N of Vanbebber Dr. 1 Fin. Sub. 11.3 116.3 10B,7 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148