Loading...
Amberpoint BP 2R-LR060324CONCRETE COMPRESSIVE STRENGTH TEST 'Report Number: 94051418.0220 Service Date: February 23, 2006 Client: Transwestern Commercial Services Attn: David Gundemon 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppeil, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 8:06am Plant: On-site Supplier: Potter Concrete Truck No: 126 Ticket No: 103142 Mix I.D. No.: 7752 Water Added Onsite Before Testl Water Added Onsite After Test: Field Test Data Test 5Gallons 0 Gallons Result Slump, inches: 4.50 Air Content, %: 5.0 Concrete Temperaturep F: 61 Ambient Temperature,o F: 40 Plastic Unit Weight, pcf: 142.4 Laboratory Test Data set Specimen Diameter Area No. ID (inches) (scI. inches) 1 1 6.O0 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Sa_~m_.ple Information Date Cast: February 23, 2006 Time: 8:36am Technician: Barry Cuble Weather Conditions: Overcast, cool, light winds Accumulative Yards: 30/560 Placement Method: Pump Sample Locations: 40' E & 25' N of S, see #1 of sketch Placement Location: Pavement, see attached sketch Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 03/02/2006 7 101,160 3,580 03/02/2006 7 102,580 3,630 Average (7 Days) 3,610 03/23/2006 28 144,340 5,100 03/23/2006 28 141,900 5,020 Average (28 Days) 5,060 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr~en consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST ~[eport Number: 94051418.0220 Service Date: February 23, 2008 'lreffacon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: mranswestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: March 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 9:14am Plant: On-site Supplier: Potter Concrete Truck No: 126 Ticket No: 103156 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 4.8 Concrete Temperaturep F: 60 Ambient Temperature,o F: 42 Plastic Unit Weight, pcf: 143.2 Laboratory Test Data set Specimen Diameter Area No. ID___ (inches) (sq. inches) 2 1 6.00 28.27 2 2 ' 6.00 28.27 2 3 6.00 28.27 2 4 8.00 28.27 Sample Information Date Cast: February 23, 2006 Time: 9:29am Technician: Barry Cuble Weather Conditions: Overcast, cool Accumulative Yards: 170/560 Placement Method: Pump Sample Locations: 85' E of W & 15' S of N, see #2 on sketch Placement Location: Pavement, see attached sketch Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 03/02/2006 7 106,390 3,760 03/02/2006 7 103,250 3,650 Average (7 Days) 3,710 03/23/2006 28 132,670 4,690 03/23/2006 28 131,810 4,660 Average (28 Days) 4,680 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparenth/similar or identical materials. Page 2 of 4 o~.m~o~., CONCRETE COMPRESSIVE STRENGTH TEST 'Report Number: 94051418.0220 Service Date: February 23, 2006 Client: Transwestem Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 ' reffacon 8901 Carpenter Fro/y, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi @ 28 Days Batch Time: 10:44am Plant: On-site Supplier: Potter Concrete Truck No: 120 Ticket No: 103172 Mix I.D. No.: 7752 WaterAdded Onsite Before Test: 10Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 5.25 Air Content, %: 5.0 Concrete Temperaturep F: 62 Ambient Temperatum,o F: 46 Plastic Unit Weight, pcf: 142.4 Laboratorl/ Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 3 1 6.00 28.27 3 2 6.00 28.27 Sample Information Date Cast: February 23, 2006 Time: 11:1 lam Technician: Barry Cuble Weather Conditions: Cloudy, cool Accumulative Yards: 330/560 Placement Method: Pump Sample Locations: 170' E of W & 15' N of S, see #3 on sketch Placement Location: Pavement, see attached sketch Specification 3-5 3-6 Date Tested 03/02/2006 03/02/2006 3 3 6.00 28.27 03/23/2006 3 4 6.00 28.27 03/23/2006 Test Method ASTM C143 ASTM C231 ASTM Cl 064 ASTM Cl 064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 103,320 3,650 7 97,560 3,450 Average (7 Days) 3,550 28 135,120 4,780 28 130,420 4,610 Average (28 Days) 4,700 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 4 ~,~,~o .CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0220 Service Date: February 23, 2006 Client: mranswestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'l['erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 24, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 12:08pm Plant: On-site Supplier: Potter Concrete Truck No: 126 Ticket No: 103187 Mix I.D. No.: 7752 Water Added Onsite Before Test: 15Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 4.50 Air Content, %: 5.2 Concrete Tempemture,o F: 67 Ambient Temperature,o F: 52 Plastic Unit Weight, pcf: 142.4 Laboratory Test Data set specimen Diameter Ama No. ID _ (inches) (scI. inches) 4 1 6.00 28.27 4 2 6.00 28.27 Sample Information Date Cast: February 23, 2006 Time: 12:27pm Technician: Barry Cuble Weather Conditions: Mostly cloudy, mild Accumulative Yards: 480/560 Placement Method: Pump Sample Locations: 80' W of E & 20' N of S, see #4 on sketch Placement Location: Pavement, see attached sketch Specification 3-5 3-6 Date Tested 03/02/2006 03/02/2006 4 3 6.00 28.27 03/23/2006 4 4 6.00 28.27 03/23/2006 Services - Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 126,580 4,480 7 127,410 4,510 Average (7 Days) 4,500 28 170,220 6,020 28 168,350 5,950 Average (28 Days) 5,990 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Barry Cuble Report Distribution: ~ (1) Transwestem Commercial Se~ices (1) TechniStructures (1) City of Coppel[ TX (1) Rogers O'Brien Construction Co Reviewed by: (1) City of Coppell TX Hussein H. Abusaad, P.E. (1) O'Brien & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 4 of 4 CONCRETE PLACEMENT OBSERVATION SKETCH 'lE rracan Date of Service: Client No.: Client: 02/23/06 50854 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94051418.0220 94051418 AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Not to Scale t N Building #4 Existing Pavement 310' ~' Placed 2/23/06 Existing Pavement