Loading...
Amberpoint BP 2R-LR060327CONCRETE COMPRESSIVE STRENGTH TEST · Report Number: 94051418.0222 Service Date: February 24, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 rerf; con 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: Mamh 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi (~ 28 Days Batch Time: 8:49am Plant: 2 Supplier: Potter Concrete Truck No: 123 Ticket No: 103221 Mix I.D. Ne.: 7752 Sample Information Date Cast: February 24, 2006 Time: 9:35am Technician: Daniel J. Drogos Weather Conditions: Overcast, cool Accumulative Yards: 220 Placement Method: Direct Discharge Sample Locations: See attached sketch for Location #1 Placement Location: Pavement Field Test Data Teat Result Slump, inches: 4.75 Air Content, %: 3.4 Concrete Temperaturep F: 60 Ambient Temperature,o F: 57 Plastic Unit Weight, pcf: 143.2 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (scI. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 Services - Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM Cl 064 ASTM Cl 38 Age at Maximum Compressive Date Test Load Stren~.th Tested (days) (lbs) (psi) 03/03~2006 7 128,870 4,560 03/24/2006 28 176,290 6,230 03/24/2006 28 177,950 6,290 6,260 Average (28 Days) 4 04/21/2006 56 Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST · Report Number: 94051418.0222 Service Date: February 24, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 Report Date: March 27, 2006 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 830-1010 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 10:00am Plant: 2 Supplier: Potter Concrete Track No: 109 Ticket No: 103232 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 3.5 Concrete Temperature,o F: 63 Ambient Temperature,o F: 57 Plastic Unit Weight, pcf: 143.7 Laborator~ Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 6.00 28.27 2 4 Sample Information Date Cast: February 24, 2006 Time: 10:13am Technician: Daniel J. Drogos Weather Conditions: Overcast, cool Accumulative Yards: 330 Placement Method: Direct Discharge Sample Locations: See attached sketch for Location #2 Placement Location: Pavement Specification 3-5 3-6 Date Tested 03/03/2006 03/24/2006 03/2412006 04/21/2006 Test Method ASTM C143 ASTM C231 ASTM Cl 064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 134,430 4,750 28 176,050 6,230 28 179,520 6,350 Average (28 Days) 6,290 56 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with app]iceble ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necesserily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST · Report Number: 94051418.0222 Service Date: February 24, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 'll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 11:09am Plant: 2 Supplier: Potter Concrete Truck No: 102 Ticket No: 103237 Mix I.D. No.: 7752 Field Test Data Test Result Slump, inches: 4.75 Air Content, %: 3.9 Concrete Temperature,o F: 60 Ambient Temperature,o F: 57 Plastic Unit Weight, pcf: 142.8 Laboratory Test Data Set Specimen Diameter Ama No. ID (inches) (scI. inches) 3 1 6.00 28.27 3 2 6.00 28.27 3 3 6.00 28.27 3 4 Sample Information Date Cast: February 24, 2006 Time: 11:28am Technician: Daniel J. Dmgos Weather Conditions: Overcast, cool Accumulative Yards: 365 Placement Method: Direct Discharge Sample Locations: See attached sketch for Location #3 Placement Location: Pavement Specification 3-5 3-6 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 03/03/2006 7 131,270 4,640 03/24/2006 28 175,100 6,190 03/24/2006 28 180,520 6,380 Average (28 Days) 6,290 04/21/2006 56 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Daniel J. Drugos Report Distribution: (1) Transvmstern Commercial Ser~ioes (1) TechniSttuctures ~J (1) City of Coppell TX (1) Rogers O'Brian Construction Co Reviewed by: (1) City of Coppell TX 5""~--~US~' , busaad, P,E. (1) O'Briart & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results trensrnitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: January 27, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spdng Valley Rd Ste 600 W Dallas TX 75244 'lr ffr.nr'on 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: Mamh 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi ~ 28 Days Batch Time: 4:06am Plant: 2 Supplier: Potter Concrete Truck No: 101 Ticket No: 102439 Mix I.D. No.: 7723 Field Test Data Test Result Slump, inches: 5.25 Air Content, %: 3.4 Concrete Temperature,o F: 65 Ambient Temperature,o F: 53 Plastic Unit Weight, pcf: 143.6 Laboratory Test Data set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 8.00 28.27 Sample Information Date Cast: Technician: Weather Conditions: Accumulative Yards: Placement Method: Sample Locations: Placement Location: Specification January 27, 2006 Daniel J. Drogos Clear, calm 130/300 Direct Discharge See Placement Location Time: 4:25am Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW corner of Job Site Test Method 3-5 ASTM C143 3-5 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 02/03/2006 7 105,680 3,740 02/24/2006 28 136,560 4,830 02/24/2006 28 153,730 5,440 Average (28 Days) 5,140 03/24/2006 56 172,450 6,100 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were pennon'ned in general accordance with applicable ASTM, AASHTO, or DOT teat methods. This report is exclusively for the use of the client indicated above and shell not be reproduced except in full without the Written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 3 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: January 27, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spring Valley Rd Ste 600 W Dallas TX 75244 rEffl!ll:On 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi ~ 28 Days Batch Time: 4:48am Plant: 2 Supplier: Potter Concrete Track No: 107 Ticket No: 102446 Mix I.D. No.: 7723 Field Test Data Test Result Slump, inches: 5.50 Air Content, %: 4.2 Concrete Temperature,o F: 60 Ambient Temperature,o F: 46 Plastic Unit Weight, pcf: 143.4 Laboratory Test Data Set specimen Diameter Area No. ID (inches) (scI. inches) 2 1 6.00 28.27 2 2 6.00 28.27 2 3 6.00 28.27 2 4 6.00 28.27 Sample Information Date Cast: Technician: Weather Conditions: Accumulative Yards: Placement Method: Sample Locations: Placement Location: Specification January 27, 2006 Daniel J. Dmgos Cloudy, cool 200/300 Direct Discharge Time: 5:06am 210' E & 55' N of SW comer of Slab Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW comer of Job Site Test Method ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) {lbs) (psi) 02/03/2006 7 104,130 3,680 02/24/2006 28 144,690 5,120 02/24/2006 28 139,900 4,950 Average (28 Days) 6,040 03/24/2006 56 148,050 5,240 3-5 ASTM C143 3-5 Services - Obtain samples of fresh concrete at the placement locations, pen~orm required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the vwiffen consent of our company. Teat results transmitted herein are onhj applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 3 o~m~o~.r~,. K.y CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051418.0128 Service Date: Janua~J 27, 2006 Client: Transwestern Commercial Services Attn: David Gunderson 5001 Spdng Valley Rd Ste 600 W Dallas TX 75244 'irefracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: March 27, 2006 Project: AmberPoint Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX Project No.: 94051418 Material Information Specified Strength: 4600 psi ~ 28 Days Batch Time: 6:23am Plant: 2 Supplier: Potter Concrete Truck No: 107 Ticket No: 102454 Mix I.D. No.: 7723 Field Test Data Test Result Slump, inches: 5.00 Air Content, %: 3.8 Concrete Temperaturep F: 60 Ambient Temperature,o F: 39 Plastic Unit Weight, pcf: 143.8 Laboratort~ Test Data set Specimen Diameter Area No, ID (inches) (scI. inches) 3 1 6.00 28.27 3 2 6.00 28;27 3 3 6.00 28.27 3 4 6.00 28.27 Sample Information Date Cast: Technician: Weather Conditions: Accumulative Yards: Placement Method: Sample Locations: Placement Location: January 27, 2006 Daniel J. Drogos Cloudy, cool 273/300 Direct Discharge Time: 6:37am 284' E & 45' N of SW comer of Slab Pavement (approximately 300' x 60') Slab; approximately 450' E of NorthPoint Parking Lot Entrance in SW comer of Job Site Specification 3-5 3-5 Date Tested 02/03/2006 02/24/2006 02/24/2006 03/24/2006 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 110,240 3,900 28 156,620 5,540 28 151,110 5,340 Average (28 Days) 5,440 56 168,360 5,950 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Daniel J. Drogos Report Distribution: (1) Transwestern Comm®rcial Services (1) Te~hniStructures (1) City of Coppell TX (1) Rogers O'Brien Construction Co Reviewed by[ (1) city of Coppell TX Hussein H. Abusaad, P.E. (1) O'Brien & Assoc Senior Project Manager The teats were pen'ormed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the preparties of other apparently similar or identical materials. Page 3 of 3