Loading...
ST9302-AG 950110 (3) AGENDA REQUEST FORM  The City With ^ Beautiful Future CITY COUNCIL MEETINO: January 10, 1995 ITEM $ ~_ ITEM CAPTION: Consideration of approval of an ordinance revising the City of Coppell Thoroughfare Plan to designate Sandy Lake Road as a four-lane divided boulevard (C4D) from Denton Tap Road to MacArthur Blvd. and authorize the Mayor to sign. · , SUBMITTED(~Y: Kenneth M. Griffin, TITLE: Asst. City Manager/Dir. Public Works INITIALS ~, STAFF COMMENTS: See Attached Memo. STAFF RECOMMENDATION Approval _X Deni~ EXPLANATION: Staff will be available to answer any questions at the Council meeting. BUDGET AMT.$ ~;/A AMT. EST.$ +/- BUD:$ FINANCIAL COMMENTS: ~ CITY MANAGER REVIEW: FINANCIAL REVIEW: Agenda Request Form - Revised 1/94 L___.T SUPPORT DOCUMENTATION FOR AGENDA ITEM STAMP RECEIVED BY CITY MANAGER'S OFFICE: SUPPORT DOCUMENTATION SUBMITTED WITH ITEM: NO. OF ORIGINALS REQUIRED MEMOS/LETTERS/REPORTS/BILLS/MINUTE · t~l for a total of pages CONTRACT/AGREEMENT · 3 originals for signature C.I.P. CONTRACT ................. : 6 originals for signature CHANGE ORDERS · 3 originals for signature ORDINANCE .................... · t~blueback for signature + 3 copies CAPTION ....................... · 1 blueback for signature RESOLUTION .................... · 2 blueback for signature + 1 copy PROCLAMATION ................. · 2 blueback for signature + 1 BIDS .......................... 1 each SUPPORTING DOCUMENTS (narrative) . . . 19 + original (over 10 pages or 5 double sided in length) LOCATION MAPS .................. 14 ZONING PLANS ................... 14 PRELIMINARY/FINAL PLATS .......... 14 SITE PLANS ...................... 14 LANDSCAPE PLANS ............. '.. . 14 ARCHITECTURAL RENDERINGS ........ 14 LENGTHY DOCUMENTS ............. 14 (zoning, subdivision ordinance, master plans) DATE PUBLISHED IN THE CITIZENS' ADVOCATE: (to meet legal requirements prior to consideration by council) NOTIFICATION TO: METHOD OF CONTACT: NOTES Agenda Request Distribution - Revised 1/94 To: Mayor and City Council From: Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works l~q RE: Consideration of approval of an ordinance revising the City of Coppell Thoroughfare Plan to designate Sandy lake Road as a four-lane divided boulevard (C4D) from Denton Tap to MacArthur Blvd. and authorizing the Mayor to sign. Date: January 10, 1995 The City of Coppell has recently evaluated the roadway system in conjunction with the technical report for the Roadway Impact Fee Study. As part of the study, I requested the consultant to evaluate Sandy Lake Road to determine if the section through the heart of Coppell should be a four or six lane roadway in the future. Council may recall that this road is currently on our Thoroughfare Plan as a C4D/6. This indicates that it is a four-lane divided boulevard in six- lanes of right-of-way. During the public meetings for Sandy Lake, there was substantial discussion as to whether or not this would ever be a six-lane roadway. Because of that discussion, I had the consultant evaluate the roadway from two perspectives: 1) Sandy Lake as a four-lane from MacArthur to the west City Limits and six lanes from MacArthur to the east City Limits; 2) Sandy Lake as a six-lane from the east City Limits to the west City Limits. Both analysis were performed for the year 2010. In an analysis of this nature, you try to evaluate the other roadway systems that will be in place for the year in which you are studying. In this case, the following improvements were included: the S.H. 121 bypass; the improved section of Beltline Road; and the 161 connector from Trinity Mills to I.H. 635. These roadways all have the effect of taking traffic off of the heart of Coppell and moving it to the major highways surrounding Coppell. I also asked the consultant to evaluate Parkway Blvd. as a two-lane undivided collector as opposed to the current four-lane divided. Council may be aware that because of the parking on Parkway Blvd. the road basically functions as a two-lane. Considering all these adjustments to the roadway system, the analysis clearly shows that Sandy Lake Road between Denton Tap and MacArthur Blvd. should be a four-lane divided roadway in the future. However, depending on the final interchange design for S.H. 121, that there may need to be a six-lane roadway between S.H. 121 and Freeport. Because the City is currently only reviewing the section of Sandy Lake Road between Denton Tap and MacArthur my recommendation is to revise the Thoroughfare Plan to designate Sandy Lake Road as a C4D from MacArthur to Denton Tap Roadway. I further recommend that prior to entering into any type of design contract on Sandy Lake Road from Denton Tap west to S.H. 121 that the City reevaluate the roadway configuration at that time to further calibrate traffic volumes and determine the proper street designation. Staff will be available to answer any questions at the Council meeting. I I I III I I J.I.._~ ~ II I I ~ANDY LAKE A~ 6 LD (EAST CITY LIMIT TO WEST CITY ~fR Zl'lO IIEIWORK & D~IKN~IMJ~S 1~f1~I~4 ~t Li~e I~md 15. Consideration and approval of an ordinance revising the City of Coppell Thoroughfare Plan to designate Sandy Lake Road as a four-lane divided boulevard (C4D) from Denton Tap Road to MacArthur Blvd. and authorize the Mayor to sign. Ken Griffin, Assistant City Manager/Director of Public Works, addressed concerns of where Sandy Lake Road will be situated. No action was taken on this item pending negotiations with the Public Utilities Commission and TU Electric. 16. PUBLIC HEARING: To consider the amendment of Land Use Assumptions, the Capital Improvement Plan for Water and Wastewater Facilities, and to consider the imposition of Water and Sanitary Sewer Impact Fees; and consider the adoption of a Capital Improvements Plan for and the imposition of impact fees for Roadway Facilities. Ken Griffin, Assistant City Manager/Director of Public Works, made a presentation to the Council. Mayor Morton opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. Again, there were none. Mayor Pro Tern Robertson moved to close the Public Hearing and approve Item 16 and Ordinance No. 95685 amending Chapter 17 of the Code of Ordinances, adopting a Roadway Impact Fee and amending the Water and Sanitary Sewer Impact Fee, and authorizing the Mayor to sign. Councilmember Reitman seconded the motion; the motion carried 5-0 with Mayor Pro Tem Robertson and Councilmembers Alexander, Watson, Reitman, and Sheehan voting in favor of the motion. 17. Discussion and consideration of approval of an ordinance amending Chapter 17 of the Code of Ordinances, adopting a Roadway Impact Fee and amending the Water and Sanitary Sewer Impact Fee, and authorizing the Mayor to sign. This item was considered under Item 16. See Item 16 for minutes. 18. Consideration and approval to award Bid Q-1194-04 for Cleaning and Related Services to American Housekeeping, Inc..in the amount of $34,619.52 for all City facilities to include the new Library with services commencing February 1, 1995. Mayor Pro Tern Robertson moved to approve Bid Q-1194-94 for Cleaning and Related Services to American Housekeeping, Inc. in the amount of $34,619.52 for all City facilities to include the new Library with services commencing February 1, 1995. Councilmember Reitman CM011095 Page 8 of 11 AN ORDINANCE OF THE CITY OF COPPELL, TEXAS ORDINANCE NO. AN ORDINANCE OF THE CITY OF COPPELL, TEXAS, AMENDING THE COPPELL THOROUGHFARE PLAN CODIFIED AT ARTICLE 15-9 OF THE CODE OF ORDINANCES OF THE CITY OF COPPELL, TEXAS TO CHANGE THE ROADWAY CLASSIFICATION OF SANDY LAKE ROAD, BETWEEN DENTON TAP ROAD AND MACARTHUR BOULEVARD, FROM C4D/6 CLASSIFICATION TO C4D; PROVIDING A REPEALING CLAUSE; PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the Coppcll Thoroughfare Plan as heretofore adopted and codified at Article 15-9 of thc Code of Ordinances of thc City of Coppell, Texas, be, and the same is hereby, amended by changing the roadway classification of Sandy Lake Road, between DenWn Tap Road and MacArthur Boulevard, from C4D/6 to C4D. SECTION 2. That all ordinances and provisions of the Code of Ordinances of the City of Coppell, Texas in conflict with the provisions of this ordinance be, and the same are hereby, repealed, and all other provisions not in conflict with the provisions of this ordinance shall remain in full force and effect. SECTION 3. That should any word, phra~, paragraph, section or portion of this ordinance, or of thc Code of Ordinances, as amended hereby, be held to be void or unconstitutional, the same shall not affect the validity of the remaining portions of said ordinance or of the Code of Ordinances, as amended hereby, which shall remain in full force and effect. SECTION 4. That this ordinance shall become effective immediately from and after its passage as the law and charter in such cases provide. I AGG06456 DULY PASSED by thc City Council of thc City of Coppcll, Texas, this the day of , 199 APPROVED: TOM MORTON, MAYOR ATTEST: LINDA GRAU, crrY SECRETARY APPROVED AS TO FORM: PETER G. sMrrH, CITY ATTORNEY (PGS/jd 12/30/94) 2 AGC:0~456