Loading...
ST9902-CS060403Suzan Taylor - RE: W Sandy Lake From: To: Date: Subject: Suzan: <jcrassl@txued.com> <staylor@ci. coppell.tx, us> 4/3/2006 1:33:28 PM RE: W. Sandy Lake Page 1 I talked with our Field Construction Coordinator "FCC" and he plans to have Mastec start around Thursday this week. According to our FCC we need Verizon to clear ahead of us before we can move back into that location After talking with the FCC we plan to actually use one of the conduits I already installed this year which will save having to cut the street again. We need to coordinate this effort with Mastec civil installation, our cable pulling crew to pull out the existing cable, a TXUED technician to clear the feeder and the pulling and splicing crew to install the new feeder. We hope to be clear by mid next week if all goes our way and weather does not affect the schedule. Joe ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] Sent: Monday, April 03, 2006 10:51 AM To: Crass, Ledlow Subject: W. Sandy Lake Joe: Do you know when TXU is going to start the relocation of the 6-inch conduit under Coppell Road and how long it will take to make the relocation?