Suzan:
<jcrassl@txued.com>
<staylor@ci. coppell.tx, us>
4/3/2006 1:33:28 PM
RE: W. Sandy Lake
Page 1
I talked with our Field Construction Coordinator "FCC" and he plans to
have Mastec start around Thursday this week. According to our FCC we
need Verizon to clear ahead of us before we can move back into that
location After talking with the FCC we plan to actually use one of the
conduits I already installed this year which will save having to cut the
street again. We need to coordinate this effort with Mastec civil
installation, our cable pulling crew to pull out the existing cable, a
TXUED technician to clear the feeder and the pulling and splicing crew
to install the new feeder. We hope to be clear by mid next week if all
goes our way and weather does not affect the schedule.
Joe
..... Original Message .....
From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us]
Sent: Monday, April 03, 2006 10:51 AM
To: Crass, Ledlow
Subject: W. Sandy Lake
Joe:
Do you know when TXU is going to start the relocation of the 6-inch
conduit under Coppell Road and how long it will take to make the
relocation?