ST9902-AG050712 THE CITY OF DEPT: Engineering AGENDA REQUEST FORM DATE: July 12, 2005 ITEM #: 20 , . J 1 "< i /1,.' ITEM CAPTIO.\i: Consider approval of a resolution adopting the approved preferred alignment of Sandy Lake Road (Coppell Road to Denton Tap Road) as described in the Memorandum of Agreement, and authorizing the Mayor to sign: and .. consider approval of the Supplemental Agreement to the Master Agreement Governing Transportation Major Capital Improvement Projects between the County of Dallas and the City of Coppell, and authorizing the City l\1anagcr to sign. GOAL(S): - IIII APPROVED BY It9J CITY COUNCIL ON ABOVE DATE Motion to Approve Res # 2005-0712"3 M - Peters S - Faught Vote - 6-0 Tunnell absent U. a,,:, . i3.3304 05'00 EXECUTIVE SUMMARY: Approval of this agenda item will allow the City and Dallas County to proceed with the implementation of the Supplemental Agreement necessary to obtain partial funding from Dallas County for the construction of Sandy Lake Road. Phase 'B'. Statfwill be available to answer any questions at the Council meeting. FI.\iA::\lCIAL CO\1MENTS: Agenda Request Form - Revised 09/04 Document Name: #WSandy Lk RESOLUTION NO. ~oo<:- ()7/2. 3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS, ADOPTING THE APPROVED PREFERRED ALIGNMENT OF SANDY LAKE ROAD PHASE 'B' (COPPELL ROAD NORTH TO DENTON TAP ROAD) AS DESCRIBED IN THE MEMORANDUM OF AGREEMENT ATTACHED TO THE SUPPLEMENT AL AGREEMENT TO MASTER AGREEMENT GOVERNING TRANSPORATION MAJOR CAPITAL IMPROVEMENT PROJECTS AND AUTHORIZING THE MAYOR TO EXECUTE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Sandy Lake Road project (S.H. 121 to penton Tap Road) was approved for partial funding through the Major Capital Improvement Program for fiscal year (FY) 2006, and the Master Agreement was implemented on April 24, 2001; and WHEREAS, the design consultant, Teague NaIl and Perkins, was directed to prepare the construction plans in two phases, Phase 'A' (S.H. 121 to CoppeIl Road N.) and Phase 'B' (Coppell Road N. to Denton Tap Road) in order to initiate construction of Phase 'A' prior to FY 2006; and WHEREAS, Dallas County made the decision not to participate in the construction of Phase 'A' and the entire funding amount is available for construction of Phase 'B', and WHEREAS, a public meeting for Phase 'B' was held on December 7, 2004 for the purpose of reaching a consensus on the design and alignment of the project as presented in the schematic design plans dated December 2001; and WHEREAS, the approved preferred alignment for Sandy Lake Road Phase 'B' IS described in the memorandum of Agreement. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Council of the City of Coppell hereby adopts the approved preferred alignment for Sandy Lake Road, Phase 'B', which is attached hereto, and incorporated herein as Memorandum of Agreement, and that the Mayor is hereby authorized to execute the resolution providing for such adoption. SECTION 2. This Resolution shall become effective immediately from and after its passage, as the law and charter in such cases provide. DUL Y PASSED and approved by the City Council of the City of Coppell, Texas, on this the /~~aYo(t~~ ,2005. ATTEST: ~ ';:~-tj - IRB -BALL, YSECRETARY-- STATE OF TEXAS ~ COUNTY OF DALLAS ~ SUPPLEMENTAL AGREEMENT TO MASTER AGREEMENT GOVERNING TRANSPORTATION MAJOR CAPITAL IMPROVEMENT PROJECTS THIS SUPPLEMENTAL AGREEMENT to the MASTER AGREEMENT GOVERNING TRANSPORT A TION MAJOR CAPIT AL IMPROVEMENT PROJECTS ("MASTER AGREEMENT") is made by and between the City of Coppell, Texas, hereinafter called "CITY", and the County of Dallas, Texas, hereinafter called "COUNTY", acting by and through its duly authorized officials, for the purpose of Transportation Improvements on Sandy Lake Road from State Highway (S.H.) ] 2] to Denton Tap Road inside Dallas County, which is on the North Central Texas Council of Govemment's Regional Thoroughfare Plan. Article I. INCORPORJ\ TED DOCUMENTS This SUPPLEMENTAL AGREEMENT incorporates the l\1ASTER AGREEMENT authorized by Court Order No. 2001-814 dated April 24, 2001; the attached MEMORANDUM OF AGREEMENT, and ATTACHMENT A, Design and Construction Criteria, as if each was reproduced herein word for word. The MEMORANDUM OF AGREEMENT was produced by the collective effort of all the parties at the Public Meeting held on December 7, 2004. Together with Attachment A, the above referenced documents define the scope of the project with an agreed upon preliminary alignment. Article II. EFFECTIVE DATE THIS SUPPLEMENTAL AGREEMENT BECOMES EFFECTIVE when signed by the last party whose signing makes the respective agreement fully executed (THE "EFFECTIVE DATE"). Article III. FISCAL FUNDING Notwithstanding anything to the contrary herein, this AGREEMENT is expressly contingent upon the availability of COUNTY funding for each item and obligation contained herein. CITY shall have no right of action against the County of Dallas as regards this AGREEMENT, specifically including any funding by COUNTY of the Project in the event that the COL'NTY is unable to fulfill its obligations under this AGREEMENT as a result of the lack of sufficient funding for any item or obllgation from any source utilized to fund this AGREEMENT or failure of any funding party to budget or authorize funding for this AGREEMENT during the current or future fiscal years. In the event of insufficient funding, or if funds become unavailable in whole or part, the COUNTY, at its sole discretion, may provide funds from a separate source or terminate this AGREEMENT. In the event that paYl11ents or expenditures are made, they shall be made from current funds as required by Chapter 79], Texas Government Code. SUPPLEMENTAL AGREEMENT FOR CITY OF COPPELL Creo/cd 011 Julr I 2005 11:49 AM Page lof3 Notwithstanding anything to the contrary herein, this AGREEMENT is expressly contingent upon the availability of CITY funding for each item and obligation contained herein. COUNTY shall have no right of action against the CITY as regards this AGREEMENT, specifically including any funding by CITY of the Project in the event that the CITY is unable to fulfill its obligations under this AGREEMENT as a result of the lack of sufficient funding for any item or obligation from any source utilized to fund this AGREEMENT or failure of any funding party to budget or authorize funding for this AGREEMENT during the current or future fiscal years. In the event of insufficient funding, or if funds become unavailable in whole or part, the CITY, at its sole discretion, may provide funds from a separate source or terminate this AGREEMENT. In the event that payments or expenditures are made, they shall be made from current funds as required by Chapter 791 , Texas Government Code. Article IV. THE CITY COVENANTS AND AGREES AS FOLLOWS: A. To execute the necessary agreements for the implementation of design and construction of the Sandy Lake Road MCIP Project 40601 from S.H. 121 to Denton Tap Road mutually agreed upon and incorporated herein by this SUPPLEMENT AL AGREEMENT. B. To provide City Council Resolution adopting approved preferred alignment as described in the attached MEMORANDUM OF AGREEMENT. c. To provide project management of the Project as designated LEAD AGENCY from commencement of planning to completion of construction. D. To provide all necessary funding in excess of the Dallas County participation which will not exceed $1,300,000 including any County project delivery costs; or an amount estimated to be $6,975,000. Article V. COUNTY AGREES AS FOLLOWS: A. To execute the necessary agreements for the implementation of design and construction of the Sandy Lake Road MCIP Project 40601 from SH 121 to Denton Tap Road mutually agreed upon and incorporated herein by this SUPPLEMENTAL AGREEMENT wherein the portion from SH 121 to Coppell Road N. is being designed, constructed, and funded 100% by the CITY. B. To provide funding in an amount not to exceed $1,300,000 less any County project delivery costs which is estimated to be about 1 ~~ of the project costs, but not to exceed S 1 00,000.00. C. COUNTY's participation will be available for Phase II (Coppell Road N. to Denton Tap Road) Sixty Days (60) prior to construction award. SUPPLEMENTAL AGREEMENT FOR CITY OF COPPELL Crealed on July 1.2005 11.49 AM Page 2 of 3 The City of Coppell, State of Texas, has executed this Agreen t pursuant to duly authorized City Council R-c3~ti(')n_~ Minutes dated the~ay 0 ,,,:, 200~. ~e.$()h.c{-:o.J# 20(J~~(J112..3 / The County of Dallas, State of Texas, has executed this Agre ent pursuant to Commissioners Court Order Number and passed on the _day of ,200 CITY OF COPPELL COUNTY OF DALLAS "-j BY: i/~-' JtM WITT, CITY MANAGER BY: MARGARET KELIHER, COUNTY JUDGE ATTEST: APPROVED AS TO FORM: APPROVED AS TO FORM: Bob Schell Chief, Civil Section Dallas County District Attorney's Office forms:psa ila SUPPLEMENTAL AGREEAfENT FOR CITY OF COPPELL Created on Julv J, 20D5 J 1.49 AM Page 3 of 3 MEMORANDUM OF AGREEMENT ST 99-02B SANDY LAKE ROAD (Coppell Road N. To Denton Tap Road) DECEMBER 7, 2004 The following items summarize the consensus developed at the December 7, 2004 Public Meeting on the Schematic Design Plans for Sandy Lake Road Plans dated December 2001. CITY OF COPPELL Ken Griffin Keith Marvin Suzan Taylor KIRBY ADDITON Walter Pettyjohn WHISPERING HILLS EdlNancy Healy TEAGUE NALL AND PERKINS Michael Jones Mark Holliday Matt Atkins SUMMERPLACE R.W. Keeping Nancy Petterson SHADYDALE ACRES Kelly Durso OAKBEND ADDITION Jack Clark Julio Len John Kellen Sandra Scott FOREST COVE Patrick Ferguson Jason Holz Cliff Hall John Fer Chuck/Netty Beaupre Michelle Moate Shawnda Lombardozzi Steven Smith VILLAGE @ COTTONWOOD CREEK April/David Terry Mike Gayler Vickie Lundquist John Sanders Susan Clark Kevin Lindbloom Steve Johnson Don Gant WOODLANDS OF COPPELL Andrew Felder Shannon Norris Robert Green Leslie Cardenus Michele Vowell COTTONWOOD EST. Alex Pier Rodger Anderson SHADOW WOODS EST. James Braun GEORGIA:'II PLACE Jayesh Patel Atul Barve Jorge Aguirre Ken Langston R.K. Jones John Walker Bill/Becky Miel Barney Barnett Tom Shapley 1. The scope for the ST 99-02B Sandy Lake Road Project is defined in the attached Design and Construction Criteria (Scope Items dated July 20, 2004, Attachment A). 2. City of Coppell will be the LEAD AGENCY for the project and provide project managcment including management of the design engineering consultant contract with Teague NaIl and Pcrkins, Inc., consultant for the project. The City of Coppell Project Manager for the project will be Ken Griffin, P.E., Director of Pub lie Works/Engineering. 3. A consensus regarding ST 99-02B Sandy Lake Road typical section alignment and known issucs was reachcd at the Public Meeting 4. Funding allocations will be as specified in the attached "Current Cost Estimates and Funding Sources."(Attachment B) In thc event that the estimated costs need to be revised, the percentages reflected in the dollar amounts shown will remain constant, subject to approval from the City of Coppell and Dallas County. 5. The proposed schedule was established in the attached "Proposed Project Schedule." (Attachment C) The consultant will review shortening the schedule in each place where it is possible. 6. All issues as resolved in the attached "Public Meeting Notes" (Attachment D) are incorporated into this MEMORANDUM OF AGREEMENT for all purposes. 2 ATTACHMENT A Supplemental A2reement to Master A2reement Governin2 Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (CoppeD Road N. to Denton Tap) ST 99-02B Date: 07-01-05 PROJECT LENGTH: ::t5786' PAVEMENT AND ALIGNMENT TOPICS PAVEMENT SECTION PAVING DESIGN CRITERIA: City of CoppeU Construction Design Standards North Central Texas Council of Govemments Standard Specifications for Public Works ROW WIDTH: Existing: Varies from 55' to 120' Proposed: 90' Minimum PAVEMENT WIDTH: Existing: 24' Proposed: 66' (4 lanes (iiJ, 12.5' + 16' median) No. of lanes proposed: 4-Lanc Divided PARKWAY: Proposed Width: 12' minimum Proposed Sidewalk Width: 5' sidewalks & 8' hike and bike trail Parkway cross fall slope maximum: 3" per foot GRADE REQUIREMENTS: Is TC 6" below adjacent ground criteria to be followed? No Any deep cuts, high fills? Yes PA VEMENT CROSS FALL PROPOSED; 1;4" per foot MINIMUM: Y4" per foot MAXIMUM: Y4 "per foot 3 ATTACHMENT A Supplemental Aereement to Master Aereement Governine Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B VERTICAL GRADE: MINIMUM: 0.5% MAXIMUM: 5.13% CENTERLINE ALIGNMENT POSITION: IN CENTER OF EXISTING ROW? No OFFSET FROM CENTER: Varies ON BRAND NEW ALIGNMENT? No LEFT TURN LANES: 15 left turn lanes MINIMUM LENGTH: 155.5' MINIMUM STORAGE: 60' WIDTH: 11' ANY DUAL LEFT TURN LANES? No ANY FREE RIGHT TURN LANES? Yes (Denton Tap /Sandy Lake Road Intersection) CRASH CUSHIONS / A TTENTUA TORS INVOLVED: No RAILROAD CROSSINGS INVOLVED: No 4 ATTACHMENT A Supplemental A2reement to Master A2reement Governin2 Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) S T 99-02B PAVEMENT STRUCTURE DESIGN WHEEL LOAD: 18 kip single axle load BUS AND HEAVY TRUCK TRAFFIC: YES X NO ROADWAY CLASSIFICATION: Maior arterial MINIMUM PAVEMENT STRUCTURE THICKNESS: 8" MINIMUM PAVEMENT BASE OR SUB GRADE THICKNESS: ~ DESIGN SPEED: 50 MPH (40 MPH (a), Coppell Road N. intersection and 45 MPH (a),Coppell S. intersection POSTED SPEED: 35 MPH MEDIANS MEDIAN WIDTH: ~ ANY MID BLOCK OPENINGS TO CONSIDER? YES NO X ANY SIDE STREETS TOO CLOSE FOR OPENING? (Oak Trail & Georgian Drive) YES X NO STANDARD TURN LANE WIDTH: II' minimum & 12' maximum STANDARD NOSE WIDTH: 2.: 5 A TT ACHMENT A Supplemental Aereement to Master Aereement Governine Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B DRIVEWAYS: MAXIMIMUM RESIDENTIAL GRADE: 6% MAXIMIMUM COMMERCIAL GRADE: 6% MINIMUM COMMERCIAL DRIVEWAY WIDTH: Width = 20' / 15' one-way Radius = 10' SIDE STREET CONSIDERATIONS: TURNING RADIUS MINIMUM: 35' major / 25' residential and minor streets PAVEMENT THICKNESS: ~ COMMERCIAL DRIVEWAY THICKNESS: 6" DRAINAGE TOPICS STORM SEWER DESIGN CRITERIA: TxDOT CITY City of Dallas Drainage Design Criteria HYDRO-35 X TP-40 INLET DEPTHS (APPROPRIATE FOR PAVEMENT THICKNESS): 4.5' (Typical) MINIMUM COVER LATERALS: 2' below sub grade (Typical) BRIDGES/BOX CULVERTS INVOLVED YES X NO 100 YEAR FLOOD PLAIN CONSIDERATION yes / 2 FT FREEBOARD 6 ATTACHMENT A Supplemental A2reement to Master A2reement Governin2 Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B PERMITS COE 404 PERMITS NEEDED YES may be required because of Cottonwood Cr. NO TNRCC 40 I PERMIT YES may be required as part of the 404 permit NO CDC PERMIT YES NO X YES NO X -- YES X -- NO EIS ADA PERMIT ANY OTHER PERMITS FROM OTHER AGENCIES SUCH AS TXDOT, DFW AIRPORT, DART ETC.? YES Texas Historical Commission NO UTILITIES LIST OF ALL KNOWN UTILITIES 1. SBC Communications, 2. TXU Electric Delivery, 3. Atmos Gas, 4. Verizon,5. Comcast, 6. AboveNet, 7. 360networks (USA) DOCUMENT KNOWN RISKS FOR OUR UTILITY PARTNERS: roadway alignment moved to the south between S.H. 121 and Coppell Road N. to miss Brazos Electric transmission towers ARE UTILITIES ON EXISTING STREET R.O.W.? Yes DO UTILITIES OWN THEIR R.O.W. OR HAVE PREVIOUS EASEMENTS? TXU has 40' utility easement HAS WORK ORDER BEEN ISSUED FOR SUE (Subsurface Utility Engineering) ? No ANY SPECIAL CONSIDERATIONS? No 7 ATTACHMENT A Supplemental Aereement to Master Aereement Governine Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B R-O-W ACQUISITION RIGHT OF WAY CONSTRAINTS, IF ANY, PROVIDE A LIST AND DESCRIPTION ALONG WITH DATA FOR RISK ASSESSMENT: Many of the newer residential developments have dedicated the right-or-way to accommodate the roadway widening. In addition, they have utility, landscape, and open space easements established beyond the right-of- way dedication. In the case of most older subdivisions, individual properties, and undeveloped tracts, the existing right-of-way is not sufficient for the proposed widening. There does not appear to be any right-or-way constraints. ANY NON-ROUTINE, i.e., CEMETARY, JUNK YARD, OLD CHURCHES, SERVICE STATIONS, CONTAMINATED SOILS, LANDFILLS, NOISE WALL CONSIDERATIONS, TRAILER PARKS, TREE ORDINANCES? YES NO X ANY NON-CONFORMING ISSUES? YES NO X R-O- W MAP NEEDED YES completed NO FIELD NOTES NEEDED YES completed NO R-O-W PLATS NEEDED YES X NO RELOCA TION ASSISTANCE INVOLVED YES NO X PARKING/LOSS OF PARKING CONSIDERA nONS YES NO X HISTORICAL SITE CONSIDERATION YES NO X 8 A TT ACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B USUAL CITY TOPICS OF CONCERN DESIGN STANDARDS TO BE USED? City of Coppell Construction Design Standards & NCTCOG Standard Specifications for Public Works Construction ORDER OF PRECEDENCE OF STANDARDS: (1) Citv ofCoppell Standards (2) NCTCOG AUXILIARY LANES? None PROVISIONS FOR FUTURE WIDENING? No LANDSCAPING? Under separate contract - Parks and Recreation Department EXPOSED AGGREGATE DRIVEWAYS, SIDEWALKS? No ST AMPED/COLORED CONCRETE? Yes IRRIGA nON? Yes - installation of the conduit is included in this proiect BRICKPAVERS? No STREET LIGHTING? Streetlights will be placed in the median - installation of the foundations and conduit will be included in this proiect. TXU will install wiring and streetlights. TRAFFIC SIGNALS? Yes at the Coppell Road North and Cappel! Road South intersections PA VEMENT MARKINGS? Yes BIKE LANES (EXTRA WIDTH)? No NEW SIDEWALKS? Yes DART BUS TURNOUTS? No BUS STOPS OR BUS SHELTERS? No 9 ATTACHMENT A Supplemental Aereement to Master Aereement Governine Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B WATER UTILITY BETTERMENTS? No WATER UTILITY RELOC. ? Yes SAN. SEWER BETTERMENTS? Yes SAN. SEWER RELOC.? Yes RETAINING WALLS? Decorative stacked-block retaining wall system (STONE, BLOCKS, GABIONS, PROPRIETARY TYPES) SOD, SEEDING, TOPSOIL? Yes DRAINAGE IMPROVEMENTS? Enclosed drainage system improvements and bridge RR CROSSING IMPROVEMENTS? No GRADE SEPARATIONS? No RAMPS OR CONNECTORS TO TXDOT FACILITIES? No SPECIAL SCHOOL OR EMERGENCY VEHICLE CONSIDERA TIONS ANY NEARBY OR ADJACENT SCHOOLS, CITY HALL, FIRE OR POLICE DEPARTMENT REQUIRING SPECIAL CONSIDERATION? No PUBLIC INVOLVEMENT CITY COUNCIL APPROVAL OF ALIGNMENT, REQUIRED? (approval of preliminary plans and award of construction contract) YES NO x HAVE ALL NEIGHBOR GROUPS PROVIDED EARLY INPUT? (citizen input solicited on 12/07/04) YES X -- NO 10 ATTACHMENT A Supplemental A2reement to Master A2reement Governin2 Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B NEIGHBORHOOD MEETING, REQUIRED (conducted on 12/07/04) YES NO x IF REQUIRED WHO CONDUCTS, CITY OR COUNTY? City CONSTRUCTIBILITY REPORT FROM INSPECTION STAFF, DOCUMENT ANY AND ALL ISSUES THAT MAY AFFECT PROJECT SCOPE, BUDGET, CONSTRUCTIBILTY, THE PROJECT SCHEDULE AND/OR THE SAFETY OF PROJECT? Sandy Lake Road, from Coppell Road North to Denton Tap, is almost completely developed with residential subdivisions. Right-of-way will be required on both sides of the existing roadway. The existing irrigation and landscaping adjacent to the right-of-way, and currently maintained by an HOA, is an issue that will have to be addressed. Four of the smaller TXU Electric transmission poles will need to be relocated. They are located within an exclusive TXU easement and the relocation will be an expense of the City. There are overhead power lines on the south of Sandy Lake and five underground power line crossings that will need to be relocated. There is an overhead power line on the north side of the roadway that will need to be relocated. There are several undcrground lines that fced off of this line that will have to be evaluated. There is a high-pressure 24-inch gas line that crossed the roadway that may require lowering. There are gas distribution lines on both the north and south side of the roadway that will need to be relocated. Access across construction areas will need to be providcd throughout all phases of construction. Temporary pavement will be needed to accommodate construction and to allow the existing roadway to remain in use. Most intersections will need to be constructed in phases to facilitate 11 ATTACHMENT A Supplemental A2reement to Master A2reement Governin2 Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: continuous access to and from Sandy Lake Road. Access to private drives will also have to be maintained. W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B The interconnect system of the proposed traffic signals will need to be addressed. Tree removal will be a major issue. MASTER AGREEMENT FUNDING On October 17, 2000, Dallas County Commissioners Court approved participation in Transportation Major Capital Improvement Projects for the Program Years 2004, 2005, and a portion of2006 by Court Order 2000-2117 with a list of proposed accepted projects attached to the Court Order. A MASTER AGREEMENT GOVERNING TRANSPORT A TION MAJOR CAPITAL IMPROVEMENT PROJECTS was executed by the City of Coppell and Dallas County pursuant to Court Order No. 2001- 814 dated April 24, 2001 which authorized transportation improvements. TOT AL ESTIMATED PROJECT COSTS $5,538,725 CITY AND/OR OTHERS P ARTICIP A TION $4,238,725 $1,300,000 DALLAS COUNTY P ARTICIP A TION 12 ATTACHMENT "B" CURRENT COST ESTIMATES AND FUNDING SOURCES COST ESTIMATE Paving Improvements Bridge Improvements Water & Sanitary Sewer Improvements Utility Adjustments Storm Drain Improvements Traffic Signal Improvements Landscaping/Irrigati on $3,289,140 701,892 188,000 40,000 614,693 155,000 $550,000 TOT AL PROJECT COST $5.538.725 FUNDING SOURCE Dallas County City of Coppell $1,300,000 $4,238,725 TOT AL PROJECT FUNDING $5.538,725 13 ATTACHMENT "C" PROPOSED PROJECT SCHEDULE Award Consultant Contract Schematic Design Complete Public Meeting Preliminary Design Complete (60%) ROW Documents Complete Primary Design Complete (90%) Final Plans Complete ROW Acquisition Complete Utility Relocations Complete Advertise For Bids Award Construction Contract Construction Complete 14 December 2000 December 2001 December 2004 October 2005 March 2006 March 2006 August 2006 December 2007 June 2008 July 2008 September 2008 March 20 I 0 ATTACHMENT "D" THE.CITY.OF COPPELL *~ ~ ~ l' WEST SANDY LAKE ROAD (COPPELL ROAD N. to DENTON TAP ROAD) ST 99-02B PUBLIC MEETING NOTES On December 7, 2004, the City of Coppell Engineering Departmcnt hosted a public meeting concerning design aspects of W. Sandy Lake Road. Over 1000 notices were sent to citizens in the adjacent subdivisions, and information was posted on the website and published in the local paper. Forty-four citizens attended the meeting along with three members of the consulting firm, Teague Nal! and Perkins, Inc., and three city staff members Prior to the meeting, there was discussion on a one-to-one basis with citizens. The schematic dcsign plans, dated December 200 I, were available for review. Thc number one concern was the removal of trees adjacent to Sandy Lake Road. Most citizens seemed resolved to the fact that trees would have to be removed to complete the project. The formal part of the public meeting started with a review of how the city got to where it is today, which included information from the City of Coppell's Thoroughfare Plan dating back to 1985 and leading up to the bond election in 1999. The schematic design plans were presented for discussion. The timetable for construction was discussed. Sandy Lake Road (from S.H. 121 to Cappel! Road N.) is anticipated to go out to bid in the second quarter of 2005 and Sandy Lake Road (from Coppel! Road N. to Denton Tap Road) is anticipated to go out to bid in the third quarter of 2007. The following issues were either resolved during the meeting or will be taken into further consideration by City staff as design of the roadway progresses: 1. There was a question about the placement of the proposed trail system on the south side of the roadway within a subdivision's common area. The city will contact the president of the Home Owner's Association (HOA) to determine how decisions are made for that particular HOA, either by the board or by the body. The city will make a presentation at a future HOA meeting and let the HOA determine if and where thc trail can be constructed in the common area. 2. There was concern about overall tree removal and the proposed landscape plan. There were several questions concerning what type of landscaping will be planted. 15 The landscape plan (drought tolerant plants) will replicate what is placed along Sandy Lake Road (Denton Tap Road to MacArthur Boulevard). Several citizens expressed an opinion that they did not like what was planted in Sandy Lake Road. 3. There was concern for the spacing of the median openings and the fact that not every street ean have a median opening. Every subdivision will have some type of median opening at one of the access points into the subdivision. 4. There was some concern expressed by several residents along the north side of the existing road that more of the proposed roadway was being built towards the north than the south. There are existing TXU transmission lines on the south side and the city is limited in its ability to work within their easement. The city will explore the possibility of moving the transmission poles to the median and then shifting the road south approximately eight to ten feet. The moving of the transmission poles will take City Council approval. The city will have to pay additional design fees for the consultant to redesign the roadway and the city will have to pay TXU to relocate their poles to the median. 5. Several citizens in the Woodlands of Coppell subdivision requested that a walkway be constructed beneath the proposed bridge on Cottonwood Creek so that children could cross Sandy Lake Road at that location and then walk down Winding Hollow to Cottonwood Creek Elementary. The city has some concerns on whether a walkway beneath the bridge will be utilized by children. In order to comply with the American with Disabilities Act, it will require a lengthy meandering walkway from the street section to the section beneath the bridge. The city does have several of these walkways in place and will take this request into consideration as the design progresses. The city anticipates having a follow-up public meeting in 2006. 16 ( \ \J~ <J )it ~ (r August 3, 2005 Mr. Ali Malekouti, P.E. Project Manager Dallas County Public Works 411 Elm Street, 4th Floor Dallas, TX 75202 RE: Sandy Lake Road (CoppeU Road N. to Denton Tap) ST 99-02 B Supplemental Agreement Dear Mr. Malekouti: Enclosed please find three executed copies of the Supplemental Agreement to the Master Agreement for the Sandy Lake Road project. Also enclosed is one original copy of the resolution approving the roadway alignment. Upon execution of the agreement, please return an original to the city. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please advise. Sincerely, Suzan C. Taylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: ~Jl:lylor((lci.Clwpel1.tx.us Enclosures .... Q) Q) u.. o o ~ IJ".l ~"f ~ z~ ~ ~ C't .S 0 oW I u"tIO\ 2 ~ ~ oWCtI.J ~~oW c Q,) U CJ ~ .~ ~.s ~ s~~ "tI~Qj g t:t ~ ~tl.Jc "tI~CJ Q,) ~Q,) ~ CI.l C C ~ ~ c .,... ... CJ "-t o !IJ .... (:i t: 'tl " .... tl " ... u ~ '~ l;....l 'c..- c..- ,0 u TI r, " o ~ "TI o U] ~ ~ D c I '" " >