Loading...
Vista Point II 3-7-CS060404 THE.CiTY.OF COPPELL April 4, 2006 Erik M. Hauglie, P.E. Pacheco Koch Engineers 8350 N. Central Expwy., Suite 5000 Dallas, TX 75260 RE: Vista Point II/Block A, Lots 3-7 Paving & Utility Improvements Dear Mr. Hauglie: As close out of the above referenced project approaches, the City of Coppell would like to bring some concerns to your attention: 1. Concentrated flows from the northern portion of the site are draining to the TxDOT ROW. These flows are in turn causing erosion and the deposit of sediment onto the ROW. 2. Flows from the southern portion of the site are not reaching inlets and are pooling. The stagnant water may be subject to Code Enforcement if it becomes a mosquito breeding ground and mosquitoes become a nuisance. 3. The southernmost driveway off of MacArthur Blvd was constructed within a few feet of a tree that was existing on the site. The tree is causing a near vertical slope at this location and has the potential to be a safety hazard. Please give some consideration to these concerns and provide a response to our office. We would be happy to meet you at the site to review the items covered in this letter, or if you have any questions, please contact this office at your convenience. ~~ Charlene La Matti;/fI. T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-3570 cc: Jeff Libby, Standridge Companies Neil Brennan, Bank of Texas PIes Schnitz, Schnitz & Sewell 255 PARKWAY * POBOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673