Amberpoint BP 2R-LR060315REPORT OF SOIL-LIME MIXTURE PULVERIZATION 1r~rr~CC~n
Consultln° Enalneers & Scientists
8901 Carpenter Frwy Suite #100
Dallas, Texas 75247
(214-630-1010
Date of Service 03/15/06
Client No 50854
Client: Transwestern Commercial Services
5001 Sprang Valley Rd Ste 600 W
Dallas, TX 75244
~~
Contractor Rogers-O'Brien Construction
Test Location AmberPolnt #6
.,-
Test Method NTCOG
Report No 94051418 0300
Project No 940514
Pro,~_#_r_____ siness Parma
Bui 4, 5 and 6
~5 South Royal Lane
Coppell, TX
Specification Requirements.
Minimum Passing 1-314" Sieve 100%
Minimum Passing #4 Sieve 60%
Sample Condition Field Moist
TEST
NO LOCATION 1-314" SIEVE
% PASSING #4 SIEVE
% PASSING
1 25' N & 50' W of SE corner 100 62
2 70' N & 40' W of SE corner 100 60
3 30' N & 150' W of SE corner 100 60
4 75' N & 160' W of SE corner 100 65
5 70' N & 250' W of SE corner 100 65
6 20' N & 240' W of SE comer 100 62
7 25' N & 60' E of SW corner 100 62
8 75' N & 40' E of SW corner 100 65
Comments
Technician: F MOrlllo
Report Distribution
y' ~ z~
O~
(1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co
(1) City of Coppell TX (1) O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures
Hussein H. Abusaad, P E
Senior Project Manager
309as This report is exclusively for the use of die client indicated above and shall not be reproduced in full without written approval of Terracon
REPORT OF REINFORCING STEEL OBSERVATION ~rC~trc7C~r1
Consultlnq Engineers & Scientists
8901 Carpenter Frwy Suite #100
Dallas, Texas 75247
(2141630-1010
Date of Service
03/15/06
Report No 94051418 0280
Client No
Client
Services
50854
Project No 94051418
Transwestern Commercial Services Project: AmberPomt Business Park
5001 Sprang Valley Rd Ste 600 W Buildings 4, 5 and 6
Dallas, TX 75244 505 South Royal Lane
Coppell, TX
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized
Structural S 1.2/01-03 and Civil C 1 01
Locations/items Observed Building #4, Panels #28A-23, 33-36, 79, 106, 108, 125-128, 22-16
Pavement, S Fire Lane and Parking, E Parking
Test Method Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debris Removed X Proper Bar Supports X Lapped Splices
X
Number of Bars X Proper Cover/Clearance X
Discrepancies/Comments Any discrepancies found were corrected at the lime of this observation unless otherwise
noted.
Field Results Report To
Technician B Cuble
Report Distribution.
(1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co
(1) City of Coppell TX (1) O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures
Hussein H Abusaad, P.E
Senior Project Manager
309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.