Loading...
Amberpoint BP 2R-LR060315REPORT OF SOIL-LIME MIXTURE PULVERIZATION 1r~rr~CC~n Consultln° Enalneers & Scientists 8901 Carpenter Frwy Suite #100 Dallas, Texas 75247 (214-630-1010 Date of Service 03/15/06 Client No 50854 Client: Transwestern Commercial Services 5001 Sprang Valley Rd Ste 600 W Dallas, TX 75244 ~~ Contractor Rogers-O'Brien Construction Test Location AmberPolnt #6 .,- Test Method NTCOG Report No 94051418 0300 Project No 940514 Pro,~_#_r_____ siness Parma Bui 4, 5 and 6 ~5 South Royal Lane Coppell, TX Specification Requirements. Minimum Passing 1-314" Sieve 100% Minimum Passing #4 Sieve 60% Sample Condition Field Moist TEST NO LOCATION 1-314" SIEVE % PASSING #4 SIEVE % PASSING 1 25' N & 50' W of SE corner 100 62 2 70' N & 40' W of SE corner 100 60 3 30' N & 150' W of SE corner 100 60 4 75' N & 160' W of SE corner 100 65 5 70' N & 250' W of SE corner 100 65 6 20' N & 240' W of SE comer 100 62 7 25' N & 60' E of SW corner 100 62 8 75' N & 40' E of SW corner 100 65 Comments Technician: F MOrlllo Report Distribution y' ~ z~ O~ (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppell TX (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Hussein H. Abusaad, P E Senior Project Manager 309as This report is exclusively for the use of die client indicated above and shall not be reproduced in full without written approval of Terracon REPORT OF REINFORCING STEEL OBSERVATION ~rC~trc7C~r1 Consultlnq Engineers & Scientists 8901 Carpenter Frwy Suite #100 Dallas, Texas 75247 (2141630-1010 Date of Service 03/15/06 Report No 94051418 0280 Client No Client Services 50854 Project No 94051418 Transwestern Commercial Services Project: AmberPomt Business Park 5001 Sprang Valley Rd Ste 600 W Buildings 4, 5 and 6 Dallas, TX 75244 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized Structural S 1.2/01-03 and Civil C 1 01 Locations/items Observed Building #4, Panels #28A-23, 33-36, 79, 106, 108, 125-128, 22-16 Pavement, S Fire Lane and Parking, E Parking Test Method Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper Cover/Clearance X Discrepancies/Comments Any discrepancies found were corrected at the lime of this observation unless otherwise noted. Field Results Report To Technician B Cuble Report Distribution. (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppell TX (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Hussein H Abusaad, P.E Senior Project Manager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.