Amberpoint BP 2R-LR060316REPORT OF REINFORCING STEEL OBSERVATION 1r~rracon
Consulting Engineers 8 Scfenlis[s
8901 Carpenter Fnvy Suite #IOD
Dallas, Texas 75247
(2141630-1010
Date of Service
03/16/06
Report No 94051418 0286
Client No
Client
Services
50854
Project No 94051418
Transwestern Commercial Services Project: AmberPomt Business Park
5001 Sprang Valley Rd Ste 600 W Buildings 4, 5 and 6
Dallas, TX 75244 505 South Royal Lane
Coppell, TX
Observe placement of reinforcing for compliance with furnished drawings
PROJECT DATA
Drawings Utilized
Structural S12/01-03 and Civil 1 O1
Locations/Items Observed Building #4, Panels 15-3, Pavement, E Parking
Test Method Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash 8 Debris Removed X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper CoverlClearance X
Discrepancies/Comments Any discrepancies found were corrected at the lime of this observation unless otherwise
noted.
Field Results Report To
Technician B Cuble
Report Distribution:
(1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co
{1) City of Coppell TX (1) O'Brien & Assoc
(1) City of Coppell TX (1) TechniStructures
Hussei H. Abusaad, P.E
Senior Project Manager
309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon