Loading...
Amberpoint BP 2R-LR060316REPORT OF REINFORCING STEEL OBSERVATION 1r~rracon Consulting Engineers 8 Scfenlis[s 8901 Carpenter Fnvy Suite #IOD Dallas, Texas 75247 (2141630-1010 Date of Service 03/16/06 Report No 94051418 0286 Client No Client Services 50854 Project No 94051418 Transwestern Commercial Services Project: AmberPomt Business Park 5001 Sprang Valley Rd Ste 600 W Buildings 4, 5 and 6 Dallas, TX 75244 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings PROJECT DATA Drawings Utilized Structural S12/01-03 and Civil 1 O1 Locations/Items Observed Building #4, Panels 15-3, Pavement, E Parking Test Method Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash 8 Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper CoverlClearance X Discrepancies/Comments Any discrepancies found were corrected at the lime of this observation unless otherwise noted. Field Results Report To Technician B Cuble Report Distribution: (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co {1) City of Coppell TX (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Hussei H. Abusaad, P.E Senior Project Manager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon