April 4, 2006
Ms. Charlene LaMattina
C11Y OF COPPELL DEPT
PO CiOX 9478
COPPELL, TK 75019
OF ENGINEERING
RF.: COPPELL TRADE CENTER {SANDY LAKE ROAD) - FINAL ACCEPTANCE
CERTIFIED MAIL
Return Receipt Requested
To Whom It May C'onccm•
Our engineer, Macatee Engmeenng, is in the process of completing the Ongoing Erosion Control Plan as regmrcd by your
Engmeenng department in order to obtain final sign-off and issuance of the Cemficate of Occupancy for Building C
Below details our intentions for maintenance of the existing erosion control facilities and for future development of the site.
• Future Development: We intend to begin development of the area shown as Buildings A and B on the approved Sitc
Plan We anticipate commencing the construction plan preparation, submittal, review and approval process no later than
Iuly 2006
• Restoration/Enhancement of Existing Erosion Control Measures: We will direct the existing crosron control
measures to be restored and/or enhanced where needed according to the Ongoing Erosion Control Plan (dated April 3,
2006) prepared by Macatee Engineering. In consideration of the intended future development, we propose to remediate
and enhance solely the measures for controlling crosron from surface runoff at this time. The remaining undeveloped
areas which are disturbed during the intended development will be stabilized following construction
• Course of Action for Dirt Pile along Sandy Lake Road: We intend to use the dirt m the pile ad~accnt to Sandy Lake
Road during the aforementwned future development. We will prevent the dirt pile from eroding according the Ongoing
Erosion Control Plan prepared by Macatee Engineering until the dirt pile is relocated. if the development process has
not commenced by July 2006, we will proceed as stated in In Case Development is Delayed described below.
• in Case Development is Delayed: In the event the intended development is postponed and the development process
has not commenced by July 2006, we will remove the dirt pile from adjacent to Sandy Lake Road, and establish and
maintain grass rover over the remaimng undeveloped portions of the referenced site This is to prevent erosion from
both surface runoff and from wind.
• Maintenance of Erosion Control Measures: We will perform the operations necessary to insure the erosion control
measures -including silt fences, rock riprap and grass -arc functioning properly for the duration of their ownership
"17iis includes imgating, reseeding and/or desilting areas where the crosron control measures arc insufficient or otherwise
not functioning properly
Should you have any questions regarding any of the items discussed above, please don't hesitate to contact our Construction
Manager, Bennett Rathff of the Rathff Group. He can be reached at 214-707-2924.
Sincerely, ! /