Loading...
Amberpoint BP 2R-LR060406REPORT OF REINFORCING STEEL OBSERVATION 1~~rr~con Consulting Engineers 8 Scientists 8901 Carpenter Frwy Suite #100 Dallas, Texas 75?4~ (2141630-1010 Date of Service 04/06/06 Report No 94051418 0341 Client No Client Services. Drawings Utilized 50854 Project No 94051418 Transwestern Commercial Services Project: AmberPomt Business Park 5001 Spring Valley Rd Ste 600 W Buildings 4, 5 and 6 Dallas, TX 75244 505 South Royal Lane Coppell, TX Observe placement of reinforcing for compliance with furnished drawings. Civil C 1 O1 PROJECT DATA Locations/Items Observed Pavement, Fire Lane and Parking, N of Building #4 Test Method Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Lenglh and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper CoverlClearance ~' Discrepancies/Comments Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To Technician: $ Cuble Report Distribution. (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppell TX (1) O'Brien & Assoc (1) City of Coppell TX (1) TechniStructures Hussein H. Abusaad, P.E. Senior Project Manager 309acs This report is exclusively for the use of the client indicated above and shall nol be reproduced without written approval of Ten-acon.