Loading...
Gateway BP(1.6)-CS060330DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gateway Business Park, Lot 3B, Block 2, Site Plan, to allow the construction of an approximate 142,120-square-foot office/warehouse building on 8 54 acres of property located at the northwest corner of Freeport Parkway and Gateway Blvd., at the request of David Memhardt, Memhardt & Associates Architects. STAFF REP.: Marcie Diamond PROJECT ID# SPA-06-0015 DRC DATE: March 30, 2006 and Apri16, 2006 CONTACT: Kennetli M. P.E., Dir. Works 972/304-3686 COMMENT STATUS: /PRELIMINARY 1. The orientation of the drawings should be consistent throughout the entire drawing set. 2. Show the required bands of stamped concrete at the driveways along Freeport Parkway. 3. Trees shall not be planted over underground City utilities. 4. Provide permission from the adjacent property owner to construct the proposed improvements on their lot. 5. The inlet along Gateway Blvd. that you are proposing to remove appears to be a low point inlet. How will the water that would otherwise drain to this inlet be handled if the proposed modifications were in place?