Gateway BP(1.6)-CS060330DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gateway Business Park, Lot 3B, Block 2, Site Plan, to allow the construction
of an approximate 142,120-square-foot office/warehouse building on 8 54 acres
of property located at the northwest corner of Freeport Parkway and Gateway
Blvd., at the request of David Memhardt, Memhardt & Associates Architects.
STAFF REP.: Marcie Diamond PROJECT ID# SPA-06-0015
DRC DATE: March 30, 2006 and Apri16, 2006
CONTACT: Kennetli M.
P.E., Dir.
Works 972/304-3686
COMMENT STATUS:
/PRELIMINARY
1. The orientation of the drawings should be consistent throughout the entire drawing
set.
2. Show the required bands of stamped concrete at the driveways along Freeport
Parkway.
3. Trees shall not be planted over underground City utilities.
4. Provide permission from the adjacent property owner to construct the proposed
improvements on their lot.
5. The inlet along Gateway Blvd. that you are proposing to remove appears to be a low
point inlet. How will the water that would otherwise drain to this inlet be handled if
the proposed modifications were in place?