Loading...
WA9701-LR060417rte 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client City of Coppell Report No.: 253812 Ms Suzan Taylor Project No.- 0511107 PO Box 9478 Date of Service: 04/04/2006 Coppell TX 75019 Report Date: 04/17/2006 Project: Denton Tap Road 16" Waterline Coppell. Texas Services- Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR. J T Dersner Inc. PROBE Standard Counts Test Me ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 35518 Current: 742 Current: 2589 (% max) Test Mode: DT Previous: 740 Previous: 2585 MOISTURE DENSITY RELATIONS 1 Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark Brown Silty Clay w/ Organics 25.5 945 Optimum +4 95 min 2 Crushed Limestone w /Clayey Sand 8 5 133 0 Optimum +4 95 min TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (Pei) (% max) Utility backfill 1 16" water lme, Station 30 +50, 2' below 6" 1 267 1167 92 1 97 grade Utility backfill 2 16" water line, Station 32 +50, 2' below 6" 1 269 1176 927 98 grade Utility backfill 3 16" water line, Station 32 +50, grade 6" 1 25 6 1169 93 1 99 Utility backfill 4 16" water line, Station 34 +50, 2' below 6" 1 25 5 118 1 94 1 100 grade Utility backfill LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc i or am other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TA4 Page 1 of 2 .report No. 253812 t�rrl No. 0>11107 Client: City of Coppell TES T NO TEST LOCATION PROBE NT'D NioisTURE NVET DENSITY DRY DENSITY DENSITY DEPTH No. f %) (pct) (pct) (% max) 5 16" water line, Station 37 +50 2' below 6" 1 262 117 5 93 1 99 grade Utility backfill 6 16" water line, Station 37 -50, grade 6 1 272 1169 Test results on this report meet project specification. Technician: Joe Jernigan Report Distribution. (1) City of Coppell (I) City of Coppell Started 8 30atn Finished 10 45a 91 9 97 �-. Scott Watson, AET CMT Operations Manager LIMITATIOINS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality ;composition. appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 N Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client City of Coppell Report No.: 253848 Ms. Suzan Taylor Project No.: 0511107 PO Box 9478 Coppell TX 75019 Date of Service: 04/04/2006 Report Date. 04/17/2006 Project: Denton Tap Road 16" Waterline Coppell, Texas Services. Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR. J T Dersner, Inc. Standard Counts Test Methods. ., ,, Gauge: Troxler 3430 ASTM D -2292 Moisture Density .ASTM D -3017 Gauge Serial No. 35518 Current: 742 Current: 2586 Test Mode: BS Previous: 740 Previous: 2585 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Crushed Limestone w /Clayey Sand 8.5 133 0 Optimum +4 95 min TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (Pei) (Pei) (% max) Paving subgrade 1 18" water line, Station 34 +50 0" 1 90 142.2 1304 98 Paving subgrade 2 18" water lme, Station 37 +50 0" 1 9.3 138 1 1264 95 Test results on this report meet project specification. I­\ Technician. Joe Jernigan Started. 2 30pm Finished. 3 45pm rl Report Distribution. (1) City of Coppell (1) C,ty of Coppell . Scott Watson, AET CMT Operations Manager LIN41TATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality i composition appearance, etc ) or anv other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. u-,TM Page 1 of 1