Loading...
TC Bank-CS060419T H E C I T V O F COPPELL ;;,.-- ,~ ri April 19, 2006 David Estopinal SLI Design, Inc 10200 Old Katy Rd Houston TX 77043 RE Town Center Bank, Natches Trace Addrtlon, Lot 1 Block C Final Acceptance Dear Mr Estopmal T-he improvements m the above referenced project were inspected during construction by the Cih of Coppell Engmeenng Department and were installed according to plans and our specifications governing such work As of October 17, 2005, the facilities are accepted subject to the two-year maintenance agreement. "I-hank you for your cooperation during this construction. and if I cant' be of further service please contact me at (972) X04-,685 S~ncerelti. Garreth D Cam ell r Construction Inspector Office Phone (972) 3 U4- ~ 685 Fay. (972) 04-;570 cc hen Griffin, P E .Director of Engineering & Public Works heath R. Marvin, P E Civil Engineer Glenn Hollowell, P E ,Asst. Director of Public Works Greg Jones, Chef Building Official Tim Oates, Fire 1\7arshal John Blacker, P E, Kimley-Horn and Associates, Inc